Powered by Made-in-China.com
Drilling Mud Pump Power End Parts Crankshaft Assembly
US$35,000.00-42,000.00
1 Piece
Sample price:US$35000.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Installation GuideWarranty
One YearManufacturing Process
ForgingSurface Treatment
Spray-PaintOperation Pressure
Atmospheric PressureMaterial
Cast Alloy SteelProduct Name
Mud Pump Crankshaft AssemblyColor
Customer's RequirementsCertificate
API 7K and ISO9001Application
Mud PumpMOQ
1 PCTransport Package
Iron RackTrademark
CustomizationOrigin
ChinaHS Code
8431431000Production Capacity
5000pieces/YearKey features
Wide Model Compatibility: Compatible with BOMCO, LANSHI, QINGZHOU, HONGHUA, DRILLMEC, EMSCO, IDECO, GARNDER DENVER, NATIONAL, OILWELL, ELLIS WILLIAMS, RUSSIAN, Wirth, and Weatherford models.
Durable Material: Manufactured from cast alloy steel with spray-paint surface treatment for longevity.
Customization Available: Color and product specifications can be customized to customer requirements.
Certified Quality: Products comply with API 7K and ISO9001 standards.
Forging Process: High-quality forging manufacturing process ensures structural integrity.
Low MOQ: Minimum Order Quantity is just 1 PC, suitable for various purchase scales.
Online Support: Provides online installation guide and one-year warranty service.
Professional Manufacturer: Best-all Petro is a professional manufacturer located in China's largest petroleum equipment center.
Company profile
Business Type: Manufacturer/Factory, Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 7 years CertifiedNearest Port: Qingdao portAverage Response Time: ≤5.43h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo. 38 Mengshan Road, Dongying District, Dongying, Shandong, China
Plant Area43 square meters
Number of Employees5
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsPetroleum machinery accessories
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2018-06-22
Main MarketsEurope, Southeast Asia/ Mideast
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:How do you transport the goods?
A:
We transport goods by container and have long-term cooperation with shipping agencies to provide the lowest shipping fees. For samples, we can send them by express.
Q:Can you satisfy special requirements?
A:
Definitely! We have strong design capacity and R&D capacity to meet special requirements.
Q:Which shipment terms can you accept?
A:
We accept EXW, FOB, CNF, CIF, DDU, and DDP shipment terms.
Q:What is the warranty period?
A:
We provide a one-year warranty for our products.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 PC.
Send Inquiry
*To:
DONGYING LIANHUI PETROLEUM TECHNOLOGY CO.,LTD
DONGYING LIANHUI PETROLEUM TECHNOLOGY CO.,LTD*Content:
Supplier replies will be sent to your registered email
You may also like
High-Quality F800 F1000 Mud Pump Power End Spare Parts
US$25.00-60.00
1 Piece(MOQ)
API 7K Oil Drilling Rig Mud Pump Sapres Crosshead Assembly Crosshead Pin for Power End Parts#0-6316-0087-00
US$1,500.00-2,000.00
2 Pieces(MOQ)
Heavy-Duty API Stainless Steel Hydraulic Mud Pump Fluid End Module and Cylinder Valve Body for Efficient Spare Parts Assembly
US$5,500.00-6,000.00
2 pieces(MOQ)
Mud Pump Valve Assembly - Essential Spare Parts for Mud Pump Reliability
US$30.00-80.00
1 Piece(MOQ)
Oil Drilling Mud Pump Spare Parts Wearing Parts Crankshaft Oilfield Drilling
US$12,000.00-53,000.00
5 Pieces(MOQ)
Mud Pump Valve Assembly - Critical Spare Part for Mud Pump Efficiency
US$30.00-80.00
1 Piece(MOQ)
Fluid End Module Mud Pump Spares Parts Oilfield Drilling API F1600
US$175.00
1 Piece(MOQ)
API Bomco Emsco Nov Ls Hhf1600 Mud Pump Part Crankshaft RS11309.02.08.00
US$10,000.00
1 Piece(MOQ)
Forged Drill Rig Tool Mud Pump Spare Parts Plug Board Assembly
US$20.00
100 Pieces(MOQ)
API F Series Crankshaft Assembly for Mud Pump Spare Parts
US$2,200.00-2,600.00
1 Piece(MOQ)
China Beyond Triplex Mud Pump Parts Piston Assembly for Drilling Equipment
US$49,000.00-50,000.00
1 Piece(MOQ)
Valve Assembly Mud Pump Replacement Parts
US$56.00-58.00
3 Pieces(MOQ)
#11-3101-0402 #11-3101-0412 Slide Upper/Lower Slide Power End Parts for Hhf-1000 Mud Pump
US$10.00-20.00
1 Piece(MOQ)
Reliable Mud Pump Parts for F800 Drilling Mud Pump Systems
US$105.00-680.00
1 Set(MOQ)
Bearings Mud Pump Part Oilfield Drilling Tongs Equipment Centrifugal Pump
US$57.00-60.00
5 Pieces(MOQ)
High-Quality Spare Parts for Oil Drilling Mud Pumps
US$899.00-900.00
5 Pieces(MOQ)
Mud Pump Spare Parts 8g2 valve Assembly for P2200
US$36.00-59.00
10 Pieces(MOQ)



















