Powered by Made-in-China.com

High Pressure Full Open Valve Assembly for Emsco Drilling Mud Pump
US$26.00
5-99 Pieces
US$21.00
100+ Pieces
Sample price:US$26.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Installation GuideWarranty
One YearModel NO.
EMSCO Full Open Valve AssemblyManufacturing Process
ForgingSurface Treatment
PolishingOperation Pressure
Atmospheric PressureMaterial
Forged Alloy Structure SteelProduct Name
Emsco Full Open Valve AssemblyColor
Customer's RequirementsCertificate
API 7K and ISO9001Application
Mud PumpMOQ
1 PCTransport Package
Wooden BoxTrademark
CustomizationOrigin
ChinaHS Code
8431431000Production Capacity
10000pieces/YearKey features
High Strength Material: Made of 20CrMnTi alloy steel with HRC60 hardness for high toughness.
Wide Compatibility: Compatible with brands like EMSCO, BOMCO, LANSHI, and QINGZHOU.
Customizable Product: Color and specifications can be customized according to customer requirements.
One Year Warranty: Includes one-year warranty coverage for mechanical defects.
Online Installation Guide: Provides remote technical support and installation guidance.
Low MOQ: Minimum order quantity is 1 piece, suitable for small batches.
Fast Lead Time: Average lead time is within 15 working days for both peak and off-peak seasons.
Multiple Payment Terms: Accepts LC, T/T, D/P, PayPal, Western Union, and small-amount payments.
Company profile
Business Type: Manufacturer/Factory, Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 7 years CertifiedNearest Port: Qingdao portAverage Response Time: ≤6.07h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo. 38 Mengshan Road, Dongying District, Dongying, Shandong, China
Plant Area43 square meters
Number of Employees5
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsPetroleum machinery accessories
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2018-06-22
Main MarketsEurope, Southeast Asia/ Mideast
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:How do you transport the goods?
A:
We transport goods by container with long-term cooperation for lowest shipping fees. Samples can be sent by express.
Q:Can you satisfy my special requirement?
A:
Definitely! We have strong design capacity and R&D capacity to meet special requirements.
Q:Which shipment terms can you accept?
A:
We accept EXW, FOB, CNF, CIF, DDU, and DDP terms.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 piece.
Q:What is the lead time for production?
A:
The average lead time is within 15 working days for both peak and off-peak seasons.
Send Inquiry
*To:
DONGYING LIANHUI PETROLEUM TECHNOLOGY CO.,LTD
DONGYING LIANHUI PETROLEUM TECHNOLOGY CO.,LTD*Content:
Supplier replies will be sent to your registered email
You may also like
Mud Pump Valve and Seat Assembly for Oilfield Drilling
US$47.00-50.00
5 Pieces(MOQ)
Mud Pump Four Web Valve Assy Drilling Rig Pump Full-Open Valve and Seat Factory
US$35.00-80.00
3 Pieces(MOQ)
Valve Assembly for Gardner Denver Pz-7 Triplex Drilling Mud Pump
US$68.00-98.00
1 Piece(MOQ)
Mud Pump Valve Assembly for Triplex Mud Pump Parts
US$53.00-55.00
3 Pieces(MOQ)
High Pressure Resistance Safe Operation Fully Open Mud Pump Part Valve
US$40.00-50.00
200 Pieces(MOQ)
Premium Durable Valve and Seat Set for Mud Pump Efficiency
US$30.00-80.00
1 Piece(MOQ)
API Standard Mud Pump Valve Assembly for Bomco/Honghua/Weatherford/Oilwell
US$60.00-80.00
1 Piece(MOQ)
Mud Pump Valves and Valve Body Valve Seat Valve Assembly for F800/1000 F1300/1600
US$20.00-45.00
1 Piece(MOQ)
Pressure Relief Valve for F1300 F1600 Mud Pump Air Bag
US$500.00-800.00
1 Piece(MOQ)
The Valve Assembly for Mud Pump
US$55.00-60.00
5 Pieces(MOQ)
High Strength Fully Open Valve / Valve Seat for Deep Well Drilling Tasks
US$40.00-50.00
200 Pieces(MOQ)
Heavy Duty Fully Open Mud Pump Valve for Onshore Oil Drilling Use
US$40.00-50.00
200 Pieces(MOQ)
Oil Drilling Gardner Denver Valve Body&Seat Valve Assembly for Triplex Mud Pump
US$20.00-50.00
5 Pieces(MOQ)
Fully Open Mud Pump Valve with Precision Design for Drilling Efficiency
US$40.00-50.00
200 Pieces(MOQ)
High Pressure Gate Valve for Mud Pump Spares
US$200.00-300.00
1 Piece(MOQ)
High Pressure Gate Valve 35MPa Z23y-350-DN50, Fig 1502 for Mud Pump Spares Parts
US$200.00-300.00
1 Piece(MOQ)
Ja-3 Safety Relief Valve for 7K Drilling Mud Pump Applications
US$180.00-315.00
1 Set(MOQ)



















