Powered by Made-in-China.com
Oilfield Mud Pump Fluid End Assembly Hydraulic Cylinder Valve Box Assembly
US$1,000.00-3,000.00
1 Piece
Sample price:US$3000.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online GuidanceWarranty
12 MonthsManufacturing Process
ForgingSurface Treatment
PolishingOperation Pressure
Atmospheric PressureMaterial
Stainless SteelColor
as RequiredCertificate
APIMachinery Test Report
ProvidedKeyword
Mud Pump Fluid End AssemblyTransport Package
WoodenTrademark
BESTAllOrigin
ChinaHS Code
84314310Production Capacity
1500pieces/MonthKey features
High Pressure Resistance: Withstands up to 31MPa working pressure with high precision valve box design.
Corrosion Resistant Material: Made of high-strength alloy steel forgings (35CrMo/40CrMnMo) with optional electroless nickel plating.
API Certification: Product conforms to API SPEC 7K specifications for oil drilling industry standards.
Customizable Design: Supports full customization, minor customization, and production based on customer drawings.
Interchangeable Cylinders: Three cylinders of each pump are interchangeable for easy maintenance and replacement.
Wide Brand Compatibility: Compatible with major brands including BOMCO, LANSHI, QINGZHOU, HONGHUA, and DRILLMEC.
12 Months Warranty: Comes with a 12-month warranty period for mechanical equipment protection.
Online Technical Support: Provides online guidance and support for product usage and troubleshooting.
Company profile
Business Type: Manufacturer/Factory, Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 7 years CertifiedNearest Port: Qingdao portAverage Response Time: ≤8.10h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo. 38 Mengshan Road, Dongying District, Dongying, Shandong, China
Plant Area43 square meters
Number of Employees5
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsPetroleum machinery accessories
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2018-06-22
Main MarketsEurope, Southeast Asia/ Mideast
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:How do you transport the goods?
A:
We transport goods by container with long-term cooperation with ship agencies for lowest fees. Samples can be sent by express.
Q:Can you satisfy special requirements?
A:
Yes, we have strong design and R&D capacity to satisfy special requirements and customizations.
Q:Which shipment terms can you accept?
A:
We accept EXW, FOB, CNF, CIF, DDU, and DDP terms.
Q:What is the warranty period?
A:
We provide a 12-month warranty for this product.
Q:What is the maximum working pressure?
A:
The valve box can withstand 31MPa working pressure.
Send Inquiry
*To:
DONGYING LIANHUI PETROLEUM TECHNOLOGY CO.,LTD
DONGYING LIANHUI PETROLEUM TECHNOLOGY CO.,LTD*Content:
Supplier replies will be sent to your registered email
You may also like
High-Quality Mud Pump Valve Assembly Parts for Sale
US$30.00-80.00
1 Piece(MOQ)
Oil Drilling Mud Pump Hydraulic End Accessories Valve Assembly Provided API ISO
US$50.00-55.00
5 Pieces(MOQ)
Premium Drilling Mud Pump Valve Insert and Assembly Components
US$30.00-80.00
1 Piece(MOQ)
High-Efficiency Hydraulic Mud Pump Valve Assembly for Optimal Performance
US$30.00-80.00
1 Piece(MOQ)
Mud Pump Parts Fluid Valve Assembly for Ht400 Mud Pump
US$50.00-55.00
5 Pieces(MOQ)
Drilling Fluid End Expendables API 7K Mud Pump Valve Assembly
US$50.00-53.00
5 Pieces(MOQ)
Oilfied Triplex Mud Pump Fluid End/Hydraulic Cylinder/Valve Box
US$1,900.00-2,000.00
1 Piece(MOQ)
Mud Pump Fluid End Mud Pump Spare Parts Module Suction Module Valve Box
US$700.00-789.00
1 Piece(MOQ)
Mud Pump Replacement Parts Mud Pump Valve Assembly List of Drilling Fluid End Expendables
US$60.00-65.00
5 Pieces(MOQ)
API Mud Pump Valve Box for Oilfield Mud Pump Fluid End
US$9,500.00-15,000.00
1 Piece(MOQ)
API Fluid End Valve Box Hydraulic Valve Box Oilfield Drilling Mud Pump
US$2,000.00-2,900.00
1 Piece(MOQ)
API Triplex Mud Pump Fluid End Modules Hydraulic Cylinder Valve Box
US$1,000.00-3,000.00
1 Piece(MOQ)
Mud Pump Fluid End Valve Body, Seat, Inserts Assembly
US$100.00-1,000.00
1 Piece(MOQ)
Valve Assembly for Gardner Denver Pz-7 Triplex Drilling Mud Pump
US$68.00-98.00
1 Piece(MOQ)
Durable API Mud Pump Valve Body for Fluid End Module
US$5,500.00-6,000.00
2 pieces(MOQ)
F500 500HP Mud Pump Valve Box Hydraulic Cylinder Head Mud Pump Valve
US$15,098.00
3 Pieces(MOQ)



















