Powered by Made-in-China.com
BS1139 En74 Drop Forged Steel Scaffolding Double Coupler for Construction
US$0.50-3.50
10,000 Pieces
Product profile
Customization
AvailableConnection Type
Clamp ConnectionFinish
ElectroplatedModel NO.
BSCMaterial
SteelType
Scaffold CouplersSuitable Tube Diameter
48.3mm 60.3mmMaterials
Q235 or as RequriedSurface Treatment
Electro-Galvanized , Hot DIP Galvanized ,PaintedStandard
En74 ,BS1139Process
Drop Forged or PressedTransport Package
Plastic Bags /Carton Box / PalletTrademark
BestconOrigin
ChinaProduction Capacity
500000 PCS/MonthKey features
Strong & Durable : Made of high-quality forged steel, safe for heavy loads.
Easy to Install : Simple bolt design, saves time on site.
Corrosion Resistant : Zinc-plated finish, works well in wet or outdoor conditions.
Meet Global Standards : Reliable for construction projects worldwide.
Company profile

Business Type: Manufacturer/FactoryAverage Response Time: ≤2.48h
About Our Factory & Business Background
AddressNo. 21, Second Avenue, Economic and Technological Development Area, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsConstruction Waterproofing Materials, Ringlock Scaffolding, PVC Waterproof Membrane, HDPE Waterproof Membrane, Tpo Roof Membrane, Waterproofing Tapes, Self Adheisve Waterproof Membrane, Scaffold Frame, Adjustable Steel Prop, Steel Support Shoring
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What surface finish do you offer ?hot dip galvanized or electro galvanized?
A:
Both are available. Hot dip galvanized offers better rust protection for outdoor or wet conditions. Electro-galvanized is more economical for indoor use.
Q:Do you test the products before shipping?
A:
Yes. Each batch is tested for weight, dimension, and slip resistance. All products meet EN74 / BS1139 standards.
Q:What is your lead time for one container?
A:
Usually 20-25 days after deposit confirmation. Faster delivery is available for small orders or repeat customers.
Send Inquiry
*To:
Bestcon New Materials (Tianjin) Co., Ltd.
Bestcon New Materials (Tianjin) Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Building Material Q235 Steel Double Coupler Scaffolding Clamp and Scaffold Clip Drop Forged Swivel Coupler
US$0.05-0.10
10,000 Pieces(MOQ)
Forged Steel Double Swivel Putlog Girder Clamp Scaffolding Coupler Sleeve Ladder
US$0.80-0.99
1,000 Pieces(MOQ)
Heavy-Duty Q235 Steel Drop Forged Scaffolding Coupler for Construction
US$1.23-1.53
500 Pieces(MOQ)
Scaffold Fitting Drop Forged Swivel Scaffolding Coupler for Construction Building Scaffolding Connector
US$0.58-3.49
100 Pieces(MOQ)
Drop Forged Scaffold Girder Coupler Galvanized Steel Beam Clamp for Construction Scaffolding
US$0.05-0.08
1,000 Pieces(MOQ)
Heavy-Duty Drop Forged Scaffolding Swivel Coupler for Safety
US$1.23-1.53
500 Pieces(MOQ)
Hot DIP Galvanized Drop Forged Scaffolding Material Fixed German Clamp Scaffold Heavy Type Double Coupler
US$0.75-2.00
1,000 Pieces(MOQ)
Durable Drop Forged Scaffolding Coupler for Secure Assembly
US$1.23-1.53
500 Pieces(MOQ)
BS1139 Scaffolding Beam Clamp/Girder Coupler with T-Bolt for Building Scaffolding
US$0.055-0.076
1,000 Pieces(MOQ)
Construction Material Scaffold Accessories Drop Forged Swivel /Fixed Coupler/Beam Clamp/Double/Single Coupler
US$0.30-0.49
10,000 Pieces(MOQ)
Drop Forged Double/Swivel Coupler 48.3mm for Scaffolding Construction
US$0.99-1.35
500 Pieces(MOQ)
Pressed Steel Swivel Coupler 48.6mm Scaffolding Swivel Clamp for Construction Scaffold Pipe
US$0.68-1.00
100 Pieces(MOQ)



















