Powered by Made-in-China.com
Drop Forged Scaffolding Putlog Coupler Single Clamp for Formwork
US$0.50-3.50
10,000 Pieces
Product profile
Customization
AvailableConnection Type
Clamp ConnectionFinish
ElectroplatedModel NO.
BSCMaterial
SteelType
Scaffold CouplersSuitable Tube Diameter
48.3mm 60.3mmMaterials
Q235 or as RequriedSurface Treatment
Electro-Galvanized , Hot DIP Galvanized ,PaintedStandard
En74 ,BS1139Process
Drop Forged or PressedTransport Package
Plastic Bags /Carton Box / PalletTrademark
BestconOrigin
ChinaProduction Capacity
500000 PCS/MonthCompany profile

Business Type: Manufacturer/FactoryAverage Response Time: ≤4.07h
About Our Factory & Business Background
AddressNo. 21, Second Avenue, Economic and Technological Development Area, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsConstruction Waterproofing Materials, Ringlock Scaffolding, PVC Waterproof Membrane, HDPE Waterproof Membrane, Tpo Roof Membrane, Waterproofing Tapes, Self Adheisve Waterproof Membrane, Scaffold Frame, Adjustable Steel Prop, Steel Support Shoring
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Send Inquiry
*To:
Bestcon New Materials (Tianjin) Co., Ltd.
Bestcon New Materials (Tianjin) Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Drop Forged Pressed Galvanized Swivel Coupler Double Scaffold Clamp for Scaffolding
US$0.40-1.50
1 Piece(MOQ)
Metal Pressed Formworks Coupler Clip Scaffolding Formwork Steel Rapid Fast Spring Clamps for Construction Formwork
US$0.20-0.50
1,000 Pieces(MOQ)
Scaffolding Scaffold Formworks Coupler Clip Formwork Steel Rapid Fast Spring Clamps for Construction Formwork
US$0.20-0.50
1,000 Pieces(MOQ)
Oudai OEM Forged Panel Steel Clamp for Formwork Scaffolding
US$0.60-1.20
1,000 kg(MOQ)
Metal Pressed Scaffolding Formworks Coupler Clip Formwork Steel Rapid Fast Spring Clamps for Construction Formwork
US$0.20-0.50
1,000 Pieces(MOQ)
Metal Pressed Scaffolding Formworks Formwork Coupler Clipsteel Rapid Fast Spring Clamps for Construction Formwork
US$0.20-0.50
1,000 Pieces(MOQ)
Construction Drop Forged Pressed Scaffolding Gi Pipe Capacity Girder Coupler H Beams Clamp
US$2.06-2.13
1,000 Pieces(MOQ)
Drop Forged Scaffolding Coupler Set Double Swivel Putlog Clamp
US$0.50-3.50
10,000 Pieces(MOQ)
Oudai OEM Steel Forged Formwork Clamp for Scaffolding Building Material
US$0.60-1.20
1,000 kg(MOQ)
Drop Forged Galvanized Ringlock Scaffolding Rosette Clamp for Vertical Standard or Tube
US$2.62-3.00
2,000 Pieces(MOQ)
Drop Forged Galvanized Scaffolding Putlog Coupler, High Strength Scaffold Clamp for Tube Fitting
US$0.0015-0.0025
500 Pieces(MOQ)
Drop Forged Scaffolding Board Clamp for Construction Scaffolding Accessories
US$0.56-1.66
1,000 Pieces(MOQ)
Drop Forged Swivel Scaffold Coupler Clamp with High Load Resistance for Site Use Scaffold Clamp Scaffolding Clamp
US$1.31-1.45
1,000 Pieces(MOQ)
Hot Galvanized Drop Forged Fixed Scaffolding/Scaffold Couplers Clamps
US$1.30-1.90
10,000 Pieces(MOQ)
Scaffolding Parts Drop Forged Half Coupler Clamp for Steel Tube Connection
US$1.31-1.45
1,000 Pieces(MOQ)
Galvanized Scaffolding Drop Forged Formwork Accessories Panel Clamp for Construction
US$3.50-3.80
600 Pieces(MOQ)
Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System
US$1.30-1.90
10,000 Pieces(MOQ)



















