Powered by Made-in-China.com
Hot DIP Galvanized Walk Through Frame Scaffolding for Construction Building
US$650.00-750.00
25 Tons
Product profile
Customization
AvailableAfter-sales Service
on Line Technical SupportWarranty
1 YearModel NO.
BSFMaterial
SteelType
MobileStructural Style
Doors ScaffoldingFramework
Frame Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
Internal ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding FramesConstruction Properties
Building ScaffoldMaterials
Q195 or as RequiredSurface Finished
Galvanized , Painted , Powder Coated or as RequrieTransport Package
Metal Strip or as RequiredSpecification
As requiredTrademark
BestconOrigin
ChinaHS Code
7308400000Production Capacity
2000 Ton / MonthKey features
High Load Capacity & Stability: Steel construction with cross bracing ensures safe working platforms up to 500kg per unit.
Rapid, Tool-Free Assembly: Modular plug-in design allows quick setup and dismantling, reducing labor time significantly.
Hot-Dip Galvanized Finish. Rust-resistant and durable for long-term outdoor construction use.
Company profile

Business Type: Manufacturer/FactoryAverage Response Time: ≤2.39h
About Our Factory & Business Background
AddressNo. 21, Second Avenue, Economic and Technological Development Area, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsConstruction Waterproofing Materials, Ringlock Scaffolding, PVC Waterproof Membrane, HDPE Waterproof Membrane, Tpo Roof Membrane, Waterproofing Tapes, Self Adheisve Waterproof Membrane, Scaffold Frame, Adjustable Steel Prop, Steel Support Shoring
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:Can you guarantee the welding quality?
A:
All welds are full-penetration, even and smooth. We perform 100% visual inspection before packing. No porosity, no cracks, no undercut.
Q:Hot-dip galvanized or just painted? How is the corrosion resistance?
A:
depends on your requirements , the corrision resistant is no any problem
Q:What is your Lead Time ?
A:
For common sizes, lead time is around 15 to 25 days after deposit. If you need urgent delivery, we can check our stock and try to arrange faster shipment.
Send Inquiry
*To:
Bestcon New Materials (Tianjin) Co., Ltd.
Bestcon New Materials (Tianjin) Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Aluminium Steel Tubular Walk Through Mason Arch H Ladder Frame Type Tower Scaffold Scaffolding Set
US$15.80-35.00
20 Sets(MOQ)
Reliable Hot-DIP Galvanized Scaffolding Kit for Construction Needs
US$100.00-500.00
1 Set(MOQ)
Hf Professional Steel Walk Through Frame Scaffolding Ringlock System for Construction Projects
US$1.00-15.00
500 Pieces(MOQ)
High Strength Hot Steel Galvanized Ringlock Scaffolding for Construction Building
US$1.99-199.99
500 Pieces(MOQ)
Construction Access Walk-Thru Frame Scaffolding System for Building Work
US$15.00-60.00
500 Pieces(MOQ)
H-Frame Walk-Through Scaffolding A572 Galvanized Painted for Construction
US$205.00-550.00
1 Ton(MOQ)
Galvanized 1219*1930mm Construction Walk Through Platform Scaffolding Marco Ladder H Frame Scaffolding
US$1,100.00-1,200.00
20 Tons(MOQ)
DIP Painted Blue Walk Through Frame Scaffolding with Joint Pin Accessories
US$15.00-60.00
500 Pieces(MOQ)
Hot DIP Galvanized Steel Building Construction Ringlock Scaffolding with Europe CE Standard
Negotiable
50 Pieces(MOQ)
Custom Size Walk-Through Scaffolding Frame 1219*1900mm for General Masonry and Stucco Construction
US$15.00-60.00
500 Pieces(MOQ)
Steel Ringlock Scaffolding Standard/Ledger/System Hot Dipped Galvanized for Construction
US$3.90
500 Pieces(MOQ)



















