SourcingAI
Try for free
Powered by Made-in-China.com
Scaffolding U Head Jack Adjustable Fork Head for Ringlock
US$650.00-850.00
20 Tons

Product profile

Customization

Available

Connection Type

Pin Connection

Finish

Galvanized

Model NO.

BSC

Material

Steel

Type

Base Plates

Surface

Galvanized

Steel Grade

Q235

Length

500mm 600mm

Transport Package

Steel Pallet

Specification

38*5mm 48*5mm

Trademark

Bestcon

Origin

China

Production Capacity

1000 Tons /Month

Key features

Precise Height Adjustment for Uneven Ground. Manufactured with high-precision threads, the Base Jack allows easy fine-tuning of vertical height, ensuring a perfectly level scaffolding platform even
Secure Support for Horizontal Timbers or Beams :The U-shaped saddle effectively holds wooden beams, H-beams, or stringers, preventing rolling or slipping, which enhances safety and stability for slab
Featuring a robust threaded stem with fine-pitch threads, the U-head allows quick height corrections, reducing labor time and improving efficiency on site.
Designed to fit most scaffolding families (Ringlock, Cuplock, Kwikstage, Frame), Chinese suppliers offer customizable dimensions (plate width, stem length, thread pitch) to meet specific project needs

Company profile

Business Type: Manufacturer/FactoryAverage Response Time: ≤4.07h

About Our Factory & Business Background

AddressNo. 21, Second Avenue, Economic and Technological Development Area, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsConstruction Waterproofing Materials, Ringlock Scaffolding, PVC Waterproof Membrane, HDPE Waterproof Membrane, Tpo Roof Membrane, Waterproofing Tapes, Self Adheisve Waterproof Membrane, Scaffold Frame, Adjustable Steel Prop, Steel Support Shoring

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is your minimum order quantity (MOQ)?
A:
We accept small trial orders to help customers test the market. For standard sizes, our MOQ is 20 tons. For mixed sizes, we can be flexible
Q:What is your lead time?
A:
For common sizes, lead time is around 20 to 30 days after deposit. If you need urgent delivery, we can check our stock and try to arrange faster shipment.
Q:Can you accept OEM or custom sizes?
A:
Yes. We can produce according to your drawings or required pipe diameters, lengths, and surface treatment. Just send us your specification list and we will confirm what we can do.

Send Inquiry

*To:Bestcon New Materials (Tianjin) Co., Ltd.Bestcon New Materials (Tianjin) Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Scaffolding Adjustable Shoring Screw Base Jack U Head
Made-in-China.com