Powered by Made-in-China.com
Q235 Processing Galvanized Construction Steel Structure
US$1,100.00
50-99 Tons
US$1,050.00
100-199 Tons
US$1,000.00
200+ Tons
Sample price:US$1200.00/ton.Request sample
Product profile
Customization
AvailableAfter-sales Service
24 Hours OnlineScale
Large BridgeModel NO.
QBT19040Surface Treatment
Hot-DIP Galvanized or PaintedType
Light Section SteelStandard
GB, ASTM, DIN, BSForming
Hot-Rolled SteelConnection Form
Welded ConnectionMember
Steel ColumnType of Steel for Building Structure
H-Section SteelResidential Wall Structure
Bottom Wall BeamApplication
Steel Workshop, Steel Structure PlatformCarbon Structural Steel
Q235B, Q345bTransport Package
Use Steel Belt and Blanket to Do PackingSpecification
11800mm*600mm*500mmTrademark
BESTOWER, Carbon Structural SteelOrigin
ChinaHS Code
73089000Production Capacity
60, 000tons/YearKey features
Customizable Surface Treatment: Hot-dip galvanized or painted according to client requests.
Flexible Material Options: Available in Q235B, Q345B, or other materials as per buyer's request.
OEM and ODM Services: We accept OEM and ODM orders to meet specific customization needs.
Professional Design Support: Engineers provide design services based on client drawings or parameters.
ISO9001 Quality Control: Manufactured under a complete quality control system certified by ISO9001.
Fast Delivery Capability: Abundant stock ensures fast delivery for all orders.
Experienced Installation Guidance: Installation supported by experienced engineers with detailed instructions.
Comprehensive After-Sales Service: 24 hours online support with professional consulting and satisfaction surveys.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2010-09-01Nearest Port: QingdaoAverage Response Time: ≤11.31hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, DAP, FCA, EXW
About Our Factory & Business Background
AddressCangzhou Road No 128, Beiguan industrial Park, Jiaozhou, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsSteel Structure Building, Steel Tower, Steel Structure, Transmission Tower, Communication Tower, Wind Turbine Tower, Monopole Tower, Steel Frame, Steel Pole, GSM Tower
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What materials are available for the steel structure?
A:
We offer Q235B, Q345B, or other materials as per the buyer's specific requests.
Q:Can the surface treatment be customized?
A:
Yes, surface treatment can be customized to hot-dip galvanized or painted as per client requirements.
Q:Do you provide design services?
A:
Yes, our professional engineering team can design the structure based on your drawings or provided parameters.
Q:What is the lead time for delivery?
A:
The average lead time is one month for both peak and off-peak seasons.
Q:Do you accept OEM and ODM orders?
A:
Yes, we accept OEM and ODM orders to provide the best purchase solution for our customers.
Send Inquiry
*To:
Qingdao Bestower Machine Co., Ltd.
Qingdao Bestower Machine Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Metal Q235 Q355 H Section Galvanized Steel Structure Shed Storage Construction for Prefab Warehouse Structural Steel Building
US$10.00-60.00
100 Square Meters(MOQ)
Prefabricated Galvanized or Painting Steel Structure for Construction House
US$1,000.00-1,100.00
50 Tons(MOQ)
Galvanized Construction Steel Structure for Building
US$1,000.00-1,100.00
50 Tons(MOQ)
Prefab Modular Mobile Clear Span Steel Structure Construction
US$30.00-50.00
100 Square Meters(MOQ)
Processing of Large Box Steel Beams for Construction Site Steel Structures
US$900.00-1,500.00
1 Ton(MOQ)
Prefabricated Metal Warehouse Steel Structure Construction with Economic Price
US$25.00-55.00
200 Square Meters(MOQ)
Hot-Dipped Galvanized Construction Steel Structure Building
US$1,000.00-1,100.00
50 Tons(MOQ)
Low Cost Prefabricated Steel Structure Construction
US$30.00-90.00
500 Square Meters(MOQ)
Qingdao Bestower Galvanized Construction Warehouse Steel Structure
US$1,000.00-1,100.00
50 Tons(MOQ)
Light Type Industrial Construction Low Cost Prefabricated Warehouses Steel Structure
US$30.00-60.00
100 Square Meters(MOQ)
Multi Storey Steel Building Construction Structure for Frame Equipment Platform
US$29.90-59.90
100 Square Meters(MOQ)
China Factory Steel Structure Design Manufacturer Construction Steel Supply
US$30.00-90.00
500 Square Meters(MOQ)
From China Light Steel Structure Construction Manufacturer
US$35.00-55.00
500 Square Meters(MOQ)
New Metal Building Steel Structure for Construction Building Materials
US$30.00-90.00
500 Square Meters(MOQ)
Factory Direct Supply Construction Warehouse Design Prefabricated Building Steel Structure
US$35.00-95.00
200 Square Meters(MOQ)
High-Resistance Heavyweight Peb Steel Frame Structure ACP Workshop Godown Chemistry Bridge Construction
US$40.00-45.00
20,000 Square Meters(MOQ)
Prefabricated Metal Light Steel Structure Construction of Tiny Corridor for Industrial Warehouse
US$20.00-45.00
50 Square Meters(MOQ)
Customized Solutions for Manufacturing. Steel Structure Materials for Construction
US$35.00-55.00
500 Square Meters(MOQ)
Prefabricated Metal Light Steel Structure Construction of Tiny Corridor for Warehouse Industrial Workshop
US$20.00-45.00
50 Square Meters(MOQ)
Light Metal Building Construction/ Prefabricated Steel Structure Warehouse
US$25.00-50.00
100 Square Meters(MOQ)



















