SourcingAI
Try for free
Powered by Made-in-China.com
Ball Valve Surface Treatment with Tungsten Carbide Coating with Hvof Spray Processing Machine
US$92,857.00
1-4 Sets
US$88,570.00
5+ Sets

Product profile

Customization

Available

After-sales Service

Life-Long Service

Warranty

1 Year

Model NO.

BP-8000

Type

Coating Production Line

Coating

Powder Coating

Substrate

Powder Coating Machine

Certification

CE, ISO

Condition

New

Core Components

PLC/ Spraying Gun

Weight

680kg

Fuel

Kerosene

Control System

Siemens PLC, Touch Screen

Transport Package

Wood Cases

Specification

control cabinet, spraying gun, powder feeder

Trademark

BP

Origin

China

Production Capacity

200/Year

Key features

HVOF Thermal Spraying: Specialized equipment for applying Tungsten Carbide and Ni-Cr coatings to surfaces.
Siemens PLC Control: Advanced control system featuring Siemens PLC and a user-friendly touch screen interface.
High Coating Strength: Delivers superior coating strength exceeding 80MPa for durable surface treatment.
Versatile Application: Suitable for small parts, large workpieces, mechanical spraying, and project construction.
CE & ISO Certified: Equipment meets international safety and quality standards with CE and ISO certifications.
Full Customization: Offers customization from samples, designs, and full customization options for clients.
1-Year Warranty: Comprehensive 1-year warranty coverage for the coating production line equipment.
Professional Support: Provides life-long after-sales service and professional coating technology guidance.

Company profile

Shanghai Bianpu Technology Co., Ltd
High Repeat Buyers Choice
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Shanghai PortAverage Response Time: ≤15h

About Our Factory & Business Background

AddressBuilding a, No. 777 Jimingtang South Road, Huaqiao Town, Kunshan City, Shanghai, China
Plant Area200 square meters
Number of Employees10
Registered Capital2,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1 set
Supply Chain Partners100

Our Production Capability & Technical Expertise

Main ProductsPlasma Spray Equipment, Kerosene Hvof Spray Equipment, Thermal Spray Equipment, Artificial Bone Joint Spray Equipment, Gas Fuel Hvof Spray Equipment, Supersonic Plasma Spray Equipmentt, Titanium Spray Coating Equipment, Non-Stick Coating Equipment, Arc Spray Equipment, Zinc Spray Coating Equipment
Production Lines1
Production MachinesRobot Welding Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers2 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2023-01-09
Main MarketsSoutheast Asia/ Mideast
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What materials can be sprayed with this HVOF equipment?
A:
The equipment is designed for thermal spraying of metal powders such as Tungsten Carbide, Ni-Cr, and chrome carbide.
Q:What is the fuel source for the BP-8000 HVOF spray equipment?
A:
The system uses kerosene and oxygen as fuel, with nitrogen or argon as the powder feeding gas.
Q:What is the minimum order quantity for this machine?
A:
The minimum order quantity is 1 set.
Q:Does the supplier offer OEM or ODM services?
A:
Yes, both OEM and ODM services are available, including customization from samples and designs.
Q:What is the lead time for production?
A:
The average lead time is 1-3 months during peak season and one month during the off-season.

Send Inquiry

*To:Shanghai Bianpu Technology Co., LtdShanghai Bianpu Technology Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Zinc Ash Melting Furnace Galvanizing Zinc Ash Treatment
Made-in-China.com
Acid Mist Treatment Tower

Acid Mist Treatment Tower

US$20,000.00-200,000.00
1 Set(MOQ)
Made-in-China.com
High-Performance PVD Nano Coating Machine for Milling Cutters
Made-in-China.com
Cicel PVD Vacuum Coating Machine for Basin or Water Sink
Made-in-China.com
Functional Coating, Dlc Vacuum PVD Coating Machine

Functional Coating, Dlc Vacuum PVD Coating Machine

US$150,000.00-286,000.00
1 Piece(MOQ)
Made-in-China.com