SourcingAI
Try for free
Powered by Made-in-China.com
Bison 2kw 168f Air Cleaner Machine Petrol Generator Spare Parts
US$1.00-10.00
10 Pieces

Product profile

Customization

Available

Conditions of Use

Car Type, Trailer Type, Marine, Land Use

Usage

Emergency Crew, Standby Unit, Common Units

Model NO.

bs-ac168f

Output Type

AC Single Phase

Cooling Method

Air Cooled

Installation Method

Portable

Generator Type

Gasoline Generator

Exporting Area

Europe, Middle East;Southeast Asia, South America

Exporting Countries 1

Germany, Poland, Turkey, Australia, Parkistan, Phi

Exporting Countries 2

Brazil, Argentina, Russia, France, Uzbekistan, Egy

Engine Type

1-Cylinder, 4-Strock, Air-Cooled Gasoline Engine

Engine Spare Parts

Carburetor, Camshaft, Spark Plug, Piston, Cranksha

Generator Type

Household Electric Power Silent Portable Gasoline

Generator Spare Parts

Stator and Rotor, AVR, Carbon Brush, Fuel Tank, Mu

Generator Output Power

1kw, 2kw, 2.5kw, 2.8kw, 3kw, 4kw, 5kw, 6kw, 7

Generator Optional

Recoil Start, Electric Start, Single Phase, Three

Keywords

Petrol Generator Spare Parts

Transport Package

Well Pack in Strong Carton

Specification

120*100*100mm

Trademark

BISON

Origin

Zhejiang, China

HS Code

8503009090

Production Capacity

20000pieces/Month

Key features

Quality Assurance: 100% tested before assembly and packing with 3% drop test.
Professional Team: R&D team with over 20, 10, and 8 years of engineering experience.
Competitive Pricing: Top quality products at competitive prices tailored to market demands.
Complete Service: Comprehensive pre-sale, in-sale, and after-sale service support.
Wide Compatibility: Spare parts for GX160-420 engines, ET generators, and water pumps.
Branded Parts: Uses qualified and branded spare parts for reliability.
OEM/ODM Support: OEM and ODM services available for customized needs.
Certified Products: Products certified with CE and other relevant standards.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2015-01-07 CertifiedNearest Port: Ningbo PortAverage Response Time: ≤1.76h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

Address1515 fengnan Road, Jiaojiang, Taizhou, Zhejiang, China
Plant Area35000 square meters
Number of Employees234
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsGenerator, High Pressure Washer, Water Pump, Engine, Spare Parts
Production MachinesBending Facility, Generator Tester, High Pressure Washer Testing Facility, Packing Facility, Production Line, Punching Facility, Tapping Facility, Washing Machine Performance Test Platform, Water Pump Tester
R&D Engineers5 people
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2015-01-07
Main MarketsSouth America, Europe, Africa, Domestic
Number of Foreign Trading Staff40
Overseas Agent/BranchNo

Our Certifications, Standards & Industry Recognition

Product CertificationCE, Others

Product Q&A

Q:What types of machines do you supply spare parts for?
A:
We supply spare parts for gasoline engines (GX series, MZ, EY), gasoline generator sets, gasoline water pumps, diesel engines, diesel generator sets, diesel water pumps, concrete vibrators, high-pressure washers, and welding machines.
Q:How do you ensure product quality?
A:
We use qualified branded parts, test 100% of machine spare parts before assembly, test 100% of generators, water pumps, and engines before packing, and conduct drop tests on 3% of good products.
Q:What is the engine model for this 2KW generator?
A:
The engine model is BS168F, which is a 1-Cylinder, 4-Stroke, Air-Cooled Gasoline Engine with 163cc displacement and 5.5hp output power.
Q:What are the payment terms accepted?
A:
We accept LC, T/T, D/P, PayPal, Western Union, and Small-amount payment.
Q:What is the lead time for orders?
A:
The average lead time is one month for both peak season and off-season.

Send Inquiry

*To:Zhejiang Bison Machinery Co., Ltd.Zhejiang Bison Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

FLS-AVR004 2kw Gasoline Generator AVR  Spare Parts
Made-in-China.com