SourcingAI
Try for free
Powered by Made-in-China.com
Ske Gh33-40kl 40kVA 40kw Online UPS Three Phase for Industrial Control
US$3.00
500-999 Pieces
US$2.00
1,000-4,999 Pieces
US$1.00
5,000+ Pieces
Sample price:US$2000.00/piece.Request sample

Product profile

Phase

Single Phase

Type

On-line

Protection

Overvoltage

Model NO.

GH33-40KL

Application

Defence

Classification

Lighting/Power

Standby Time

Long-acting Machine

Standby UPS

Sine Wave Output UPS

Output Capacity

Minitype

Equipment Mode

Decentralized

Brand

Ske

Capacity

40 kVA / 40 Kw

Topology

Online Double Conversion

Phase Config

3 Phase in / 3 Phase out

Parallel Capability

up to 4 Units

Input Voltage

3X380VAC (3pH+N+PE)

Input Voltage Range

110-300VAC @50% Load; 176-276VAC @100% Load

Input Frequency

40-70Hz

Input Power Factor

>=0.99 @100% Load; Thdi <3% (Linear Load)

Output Voltage

3X360/380/400/415VAC (3pH+N), +/-1%

Output Frequency

46-54Hz or 56-64Hz

Output Waveform

Pure Sine Wave

AC-AC Efficiency

AC Mode 96%; Eco Mode 99%; Battery Mode 96%

Overload Capability

110-110% 60min; 111-125% 10min; 126-150% 1min; >15

Transfer Time

0ms (AC to Battery and Inverter to Bypass)

Bypass Voltage Range

-30% ~ +20% (Adjustable)

Transport Package

Carton

Trademark

SKE

Origin

China

HS Code

8504402000

Production Capacity

50000sets/Year

Key features

Zero Transfer Time: Pure online double-conversion topology ensures 0ms transfer time for critical power protection.
High Efficiency ECO Mode: Achieves up to 99% efficiency in ECO mode and 96% in AC mode for energy savings.
Full Active Power: Output power factor of 1.0 allows 40 kVA to deliver full 40 kW active power.
Wide Input Voltage Range: Accepts 110-300 VAC input, making it compatible with generators and unstable power sources.
Parallel Capability: Supports parallel operation of up to 4 units for redundancy or capacity expansion.
Pure Sine Wave Output: Provides clean pure sine wave output with low harmonic distortion for sensitive equipment.
Multiple Communication: Equipped with SNMP, USB, and RS-232 interfaces for comprehensive power management.
Long Battery Runtime: Features adjustable battery number and three-stage charging for extended standby time.

Company profile

Beijing Jinyida Borui Technology Development Co., Ltd.
Importers and ExportersFull CustomizationFast Delivery
Business Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.49h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

Address313, Floor 3, Building 1, Yard 4, Fuze Road, Fangshan, Beijing, China
Plant Area220 square meters
Registered Capital10,000,000 RMB
International Commercial Terms(Incoterms)CIF, CFR, EXW, FOB
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main ProductsUPS
R&D Engineers2 people

Our Industry Experience & Global Business Record

Year of Establishment2010-07-14
Main MarketsDomestic
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO14001, ISO45001:2018

Product Q&A

Q:Are you a factory or a trading company?
A:
We are a factory established in 2015. Our main products include UPS, photovoltaic inverters, micro-module data centers, and energy storage batteries.
Q:What is your minimum order quantity (MOQ)?
A:
For standard products in stock, the MOQ is 1 piece. For non-standard customized products, the specific quantity needs to be confirmed with our sales representative.
Q:What are the payment terms?
A:
By T/T (Telegraphic Transfer), 30% advance payment as deposit, and 70% balance paid before shipment. Photos of products and packaging will be provided before the balance payment.
Q:What are the delivery terms?
A:
We support EXW, FOB, CIF, CFR, and DDP.
Q:What is your delivery time?
A:
Generally, samples take 5-10 days, and formal orders take about 7-20 days after receiving the advance payment. The specific time depends on the product model and order quantity.

Send Inquiry

*To:Beijing Jinyida Borui Technology Development Co., Ltd.Beijing Jinyida Borui Technology Development Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like