SourcingAI
Try for free
Powered by Made-in-China.com
Ske Skgh11-10K 10kVA 8kw Industrial Frequency Online UPS Single Phase
US$1,667.00
1-19 Pieces
US$1,660.00
20-99 Pieces
US$1,579.00
100+ Pieces
Sample price:US$2000.00/piece.Request sample

Product profile

Phase

Single Phase

Type

On-line

Protection

Overvoltage

Model NO.

SKGH11-10K

Application

Defence

Classification

Lighting/Power

Standby Time

Long-acting Machine

Standby UPS

Sine Wave Output UPS

Output Capacity

Medium Type

Equipment Mode

Decentralized

Brand

Ske

Capacity

10kVA/8kw

Topology

Online Double Conversion

Phase Config

Single Phase in / Single Phase out

Input Voltage

200/220/230/240VAC

Input Voltage Range

160-280VAC

Input Frequency

47.5-52.5Hz or 57-63Hz

Output Voltage

200/220/230/240VAC

Output Power Factor

0.8

Transfer Time

0ms (Inverter to Bypass)

AC-AC Efficiency

>=85% (Mains Mode)

Battery Voltage

218VDC

Battery Config

16 Cells

Max Charge Current

Std 1A; Long-Run 5A

Dimension Std (Wxdxh)

310X690X815

Net Weight Std (Kg)

71

Transport Package

Carton

Specification

310X690X815

Trademark

SKE

Origin

China

HS Code

8504402000

Production Capacity

50000sets/Year

Key features

Industrial Frequency UPS: 10kVA/8KW online double-conversion system with output isolation transformer for critical infrastructure.
High Efficiency ECO Mode: Overall efficiency up to 85%+; ECO mode efficiency reaches up to 98% for energy saving.
Wide Input Voltage Range: Strong grid adaptability with input voltage range of 160-280VAC and frequency 47.5-52.5Hz or 57-63Hz.
Zero Transfer Time: 0ms transfer time from Mains to Battery and Inverter to Bypass ensures uninterrupted power supply.
N+1 Parallel Redundancy: Supports N+1 parallel redundancy for high availability in demanding industrial applications.
Intelligent Battery Management: Features self-diagnosis, auto-check, and overload/short-circuit protection for battery safety.
Comprehensive Communication: Standard USB/RS232 ports with optional SNMP, AS400, and ModBus cards for remote monitoring.
Portable Design: Equipped with self-locking caster wheels for easy movement and stable installation.

Company profile

Beijing Jinyida Borui Technology Development Co., Ltd.
Importers and ExportersFull CustomizationFast Delivery
Business Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤1.35h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

Address313, Floor 3, Building 1, Yard 4, Fuze Road, Fangshan, Beijing, China
Plant Area220 square meters
Registered Capital10,000,000 RMB
International Commercial Terms(Incoterms)CIF, CFR, EXW, FOB
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main ProductsUPS
R&D Engineers2 people

Our Industry Experience & Global Business Record

Year of Establishment2010-07-14
Main MarketsDomestic
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO14001, ISO45001:2018

Product Q&A

Q:Are you a factory or a trading company?
A:
We are a factory established in 2015. Our main products include UPS, photovoltaic inverters, micro-module data centers, energy storage batteries, etc.
Q:What is your minimum order quantity (MOQ)?
A:
For standard products in stock, the MOQ is 1 piece. For non-standard customized products, the specific quantity needs to be confirmed with our sales representative.
Q:What are the payment terms?
A:
By T/T (Telegraphic Transfer), 30% advance payment as deposit, and 70% balance paid before shipment. Before you pay the balance, we will provide you with photos of the products and packaging.
Q:What are the delivery terms?
A:
We support EXW, FOB, CIF, CFR, and DDP.
Q:What is your delivery time?
A:
Generally, samples take 5-10 days, and formal orders take about 7-20 days after receiving the advance payment. The specific delivery time depends on the product model and order quantity.

Send Inquiry

*To:Beijing Jinyida Borui Technology Development Co., Ltd.Beijing Jinyida Borui Technology Development Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

High Frequency 6kVA UPS Online UPS for Industrial UPS
Made-in-China.com
Industrial UPS 3 Phases High Frequency Online UPS 40kVA
Made-in-China.com
1 in / 1 out Low Frequency Qz Series Online UPS
Made-in-China.com