Powered by Made-in-China.com

520kw 650kVA Sdec Silent Diesel Generator Set for Mining/Data Center/Construction Auto-Start, Custom
US$99,999.00
1 Piece
Product specifications
color
Product profile
Customization
AvailableAfter-sales Service
Warranty and AccessoriesWarranty
Warranty and AccessoriesModel NO.
6KTAA25-G39Type
Self-Starting Diesel GeneratorInstallation Method
FixedStroke
Four StrokeCooling Method
Water CoolingOutput Type
AC Three PhaseSpeed
1500rpmConditions of Use
Land UseUsage
Common Units, Standby Unit, Emergency CrewLanduse Type of Unit
OrdinaryExcitation Mode
AC Rotating ExciterPrime Power
520kwFrequency
50/60HzCanopy
CustomizedColor
Customers' RequirementEngine
Original SdecController
Deepsea/Smartgen/etcApplication
Industrial Backup, Construction Sites, Data CenterTransport Package
Bubble WrapSpecification
3120*1360*2300, 4400*1600*2300Trademark
SDECOrigin
ChinaHS Code
85021100Production Capacity
500PCS Per MonthKey features
Cummins Engine Power: Powered by 6BTA5.9-G2 Cummins engine for high torque and fuel efficiency.
Flexible Customization: Canopy, color, voltage, frequency, and phase can be customized to customer requirements.
Comprehensive Warranty: 12 months or 1000 hours warranty covering free spare parts for quality issues.
24/7 Technical Support: Professional team available around the clock for maintenance and repair services.
Low Noise Design: Silent canopy with high-density sound-absorbing material and optimized air flow.
International Certifications: Complies with ISO 8528, GB/T2820, CE, and EPA Tier 4 standards.
Long Operating Time: 230L fuel tank provides over 8 hours of operation at 75% load.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Flexible customization CertifiedExport Year: 21 Years CertifiedNearest Port: Fuzhou PortAverage Response Time: ≤10.63h
AI-Powered supplier vetting
SummaryFujian Bobig Electric Machinery Co., Ltd. is identified as a Chinese limited-company manufacturer established in 2004, offering generators, engines, alternators, gensets, and related products. It reports OEM and ODM capabilities, flexible customization, ERP-based process management, and certifications including ISO9001:2015, ISO45001:2018, ISO14001, and CE. However, the information also states that it has no valid manufacturing-capacity contract with associated subcontractors, no in-stock capacity, no overseas warehouse, agents, branches, or showroom, and no participation in offline trade shows. Financial records are referenced for 2022–2024, but no financial figures are provided. Evidence of customer cases is limited to a general OEM claim for popular brands.
Supplier typeThe supplier is described as both a manufacturer and a trade company, and is legally structured as a limited company. It is located in Fuan, Ningde, Fujian, China, and offers a broad range of generator-related products.
CertificationsThe supplier reports ISO9001:2015, ISO45001:2018, ISO14001, and CE certification capability. These stated certifications provide explicit evidence of quality, occupational safety, environmental, and product-compliance coverage.
After-Sales capabilityThe supplier states that it offers repair and training, but has no overseas agents or branches, no overseas warehouse, no overseas showroom, and serves zero countries overseas. This indicates some stated service offerings but significant limitations in overseas service infrastructure.
R&D capabilityThe supplier reports ODM services and flexible customization, but has no available SDK and no new products during the past year. The evidence shows some development-related service capability but also a stated lack of recent product innovation.
Production capacityThe supplier is identified as a manufacturer with 39 or 115 employees in the provided records, offers a broad generator product range, and reports average lead times of within 15 working days off-season and one month during peak season. Nevertheless, it has no in-stock capacity and no valid manufacturing-capacity contract with associated subcontractors, creating explicit production-support limitations.
Customization capabilityThe supplier explicitly reports OEM service for popular brands, ODM availability, and flexible customization through R&D. These statements directly support the supplier’s ability to provide customized and customer-specific products.
Product Q&A
Q:What is your MOQ, payment method, delivery time?
A:
Our MOQ is only 1 set. Payment method usually is 30% T/T as deposit, 70% balance T/T before delivering. Or 100% L/C, tradeassurance, paypal, wester union..Delivery period normally will be 30~45 working days after receiving customers' deposit.
Q:Which port do you often use when export?
A:
Fuzhou port,Fujian province or as customer request.
Q:Is there any spare parts you can provide along with genertors to make the maintenance convenient?
A:
We can provide regular engine's air filter, water filter, fuel filter, oil filter to customers for self-maintenance.
Q:Can you offer parts to us if we need?
A:
Yes,we can offer parts to you at any time,not limited in warranty time.usually the parts can be sent out during 3-5days.
Q:For voltage,frequency,tank capacity,phase and color,can you made accord with our requests?
A:
Yes,they can be made accord with your need.
Send Inquiry
*To:
Fujian Bobig Electric Machinery Co., Ltd.
Fujian Bobig Electric Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
50/60Hz 360kw 500kw 600kw 700kw 1000kVA Big Heavy Open Type Silent 800kw 1000kw Diesel Generator Set Manufacturer
US$140,000.00-165,000.00
1 Piece(MOQ)
250kVA Open-Frame Diesel Generator Set for Data Center Emergency Backup Power Supply
US$16,200.00
1 Piece(MOQ)
Factory Price Premium 720kw 900kVA Open Type Diesel Generator Set with Mtu Engine Leroy-Somer Alternator Deif Controller for Data Centres
US$114,000.00-115,000.00
1 Piece(MOQ)
Silent Doosan Biogas Generator Set Oilfield Associated 1250kVA 50Hz for Mining Site Main Power
US$4,208.00-5,315.00
1 Set(MOQ)
900kVA 720kw Open Type Diesel Generator Set with Mtu Engine Leroy-Somer Alternator Deif Controller 380V/400V/415V for Ai Data Centers
US$114,000.00-115,000.00
1 Piece(MOQ)
Super Silent Yuchai Diesel Generator Set for Deepsea 40kVA 50Hz for Mining Site Main Power
US$3,659.00-4,119.00
1 Set(MOQ)
Reliable 30-1500kw Diesel Generator Set, Emergency Backup Power for Construction & Data Center, Customizable Solutions
US$3,269.23-157,655.38
1 Piece(MOQ)
500kVA 400kw off Grid Diesel Silent Generator Set for Remote Mining Oilfield
US$8,000.00-15,000.00
1 Piece(MOQ)
Jsst Silent Diesel Generator Set for Construction and Mining Projects
US$2,300.00
1 Set(MOQ)
1000kw 1800rpm Prime Power Rated Diesel Engine Generator Set for Data Infrastructure
US$2,450.00-5,000.00
1 Piece(MOQ)
Skid-Mounted 50Hz Motor Diesel Generator Set for Factory Bank Data Center
US$845.00-3,999.00
1 Set(MOQ)
9-1000kVA; 380V/400V/415V ISO/CE/Tlc Silent Data Center Enclosure Type Soundproof Diesel Generator Set Manufacture
US$98,000.00-99,000.00
1 Piece(MOQ)
300kVA Diesel 400V Three Phase Compact Frame Open Generator Set for Data Centers
US$3,200.00-6,500.00
1 Piece(MOQ)
High Performance Yuchai 1000kw Generator Set for Hospital & Data Center Backup
US$1,500.00-155,000.00
1 Piece(MOQ)
1500kVA Custom Parameter Diesel Generator Set for Overseas Mining and Construction Projects Open Silent Optional
US$67,360.00-76,380.00
1 Piece(MOQ)
1250kVA 1000kw Diesel Generator Set with Yuchai Engine for Data Center
US$68,000.00-72,200.00
1 Piece(MOQ)
Perkans LPG Generator High Temperature 200kVA 50Hz Super Silent Natural Gas Generator Set for Mining Temporary Power
US$3,693.00-4,332.00
1 Set(MOQ)
Durable 520kw/650kVA Generator Sets with Pks Engine 2806A-E18tag2 for Mixing Plant
US$62,000.00-71,000.00
1 sets(MOQ)
Silent Diesel Rated 600 kVA Custom Frequency for Telecom Standby Generator Set
US$850.00-128,000.00
1 Piece(MOQ)





























