Powered by Made-in-China.com
HDG Carbon Steel Welded En74 6m Scaffolding Pipe
US$9.80-14.80
1,000 Pieces
Product profile
Customization
AvailableAfter-sales Service
2 YearWarranty
2 YearModel NO.
BST-685Material
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
TubesConstruction Properties
Building ScaffoldDiameter
48.3mm / 38mm / 42.3mm / 60.3mm /CustomizedStandard
BS1139 / En39Thickness
1.5mm /1.8mm/2.4mm/3.0mm/3.2mm/4.0mm/CustomizedSurface Treatment
HDG / Pre-Galvanized / Black / PaintedMaterials
Q195/Q235/Q355bLength
0.3-12mWeld Type
ERW or SeamlessPipe Ends
Plain / Threaded with Plastic Caps or CouplersBundle Packing
61PCS/BundleCommon Applications
Structural Bracing, Fencing, GreenhousesTransport Package
ContainerTrademark
bythaiOrigin
ChinaHS Code
73084000Production Capacity
3000tons/MonthKey features
Customizable Dimensions: Diameter, thickness, and length can be customized to specific project requirements.
International Standards: Manufactured in strict compliance with BS1139 and EN39 safety standards.
Corrosion Resistance: Hot-dip galvanized surface ensures long service life in harsh weather conditions.
High Load Capacity: High-grade Q195/Q235/Q355B steel ensures exceptional durability and strength.
Flexible Surface Options: Available in HDG, Pre-Galvanized, Black, or Painted finishes.
2-Year Warranty: Comprehensive 2-year warranty coverage for mechanical defects and quality assurance.
Versatile Applications: Suitable for high-rise buildings, bridges, tunnels, and offshore platforms.
Professional Support: 10+ years experience with dedicated technical team for consultation and support.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2023-11-01Nearest Port: Tianjin/Qingdao/ShanghaiAverage Response Time: ≤2.01hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF
About Our Factory & Business Background
AddressNo. 1245, Xiaguanchong, Meihua Community, Jiangbei Industry, Changsha, Hunan, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding Tubes, Ringlock System, Steel Planks, Coupler, Steel Prop, Frame System, Scaffolding Screw Jack, Ladder, Aluminum Product, Scaffolding
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the warranty period for the scaffolding pipe?
A:
We provide a 2-year warranty for our scaffolding products.
Q:Can the dimensions of the scaffolding pipe be customized?
A:
Yes, we offer customization for diameter, wall thickness, and length to meet specific project needs.
Q:What safety standards does the product comply with?
A:
The product is manufactured in strict compliance with BS1139 and EN39 international standards.
Q:What materials are used for the scaffolding pipe?
A:
We use high-grade steel materials including Q195, Q235, and Q355B to ensure strength and durability.
Q:What surface treatments are available?
A:
Available surface treatments include Hot-Dip Galvanized (HDG), Pre-Galvanized, Black, and Painted.
Send Inquiry
*To:
Bythai Scaffolding Co.,Ltd.
Bythai Scaffolding Co.,Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Seamless Gi Steel En74 6m Scaffolding Pipe
US$9.80-14.80
800 Pieces(MOQ)
Seamless Gi Carbon Steel En74 3m Scaffolding Pipe
US$9.80-14.80
1,000 Pieces(MOQ)
Easy Carbon Steel BS1139/En39/JIS G3444/GB Standard HDG/Pre-Galvanized Scaffolding Steel Pipe
US$11.50-14.00
1,000 Pieces(MOQ)
Seamless Round Carbon Steel En74 3m Scaffolding Pipe
US$9.80-14.80
800 Pieces(MOQ)
Carbon Steel 6m HDG Tubular Gi BS1139 Pipe
US$9.80-14.80
800 Pieces(MOQ)
Easy Scaffolding Building Construction En74 BS1139 Hot Dipped Galvanized HDG Tube Scaffolding Steel Pipe
US$12.00-13.00
500 Pieces(MOQ)
Building Construction En74 Steel Tube BS1139 Hot Dipped Galvanized HDG Tube Scaffolding Steel Pipe
US$12.00-13.00
100 Pieces(MOQ)
Stk500 En74 Low-Carbon Steel Pipe for Scaffolding
US$0.95-1.10
1 kg(MOQ)
BS1139 En 74 Carbon Seamless Welded 48vs 60vs76mm Galvanized Steel Round Pipe
US$900.00-1,200.00
10 Tons(MOQ)
Premium Seamless Carbon Steel Pipe for Scaffolding Projects
US$1,030.00
25 Tons(MOQ)
Scaffolding Steel Pipe Hot Dipped Galvanized Weather Resistant Construction Scaffold Tube Welded Steel Pipe Safe Working
US$14.28-14.53
1,000 Pieces(MOQ)
Seamless Carbon Steel Round Pipe for Scaffolding Construction Projects
US$1,030.00
25 Tons(MOQ)
Easy Building Material 6m Tube 48.3mm Scaffolding Pipe
US$9.60-12.87
1,000 Pieces(MOQ)
China Factory Scaffolding Clamps and Scaffold Tube Scaffolding for Sale ERW Carbon Steel Pipe
US$650.00-1,000.00
1 Ton(MOQ)
SGS Test HDG Steel Tube Black Galvanzied Pipe Steel Pipe Scaffolding Pipe with Cheap Price
US$650.00-1,000.00
1 Ton(MOQ)
48.2 48.3 60.3hot DIP Galvanized Steel Pipe ERW Carbon Steel Scaffolding Pipe for Building
US$750.00-950.00
10 Tons(MOQ)
ERW Seamless Steel Tube Hot Dipped Galvanized Welded Steel Pipe for Tubular Scaffolding
US$700.00-1,000.00
1 Ton(MOQ)
BS1139 HDG 48.3mm*3.2mm*6m Scaffolding Tube Steel Pipe with Low Price
US$500.00-800.00
20 Tons(MOQ)



















