SourcingAI
Try for free
Powered by Made-in-China.com
Fully Sealed Three Phase Oil Immersed Distribution Transformer for Outdoor Mining Substations
US$600.00-3,100.00
1 Set

Product profile

Customization

Available

Application

Power

Phase

Three-Phase

Model NO.

S13/S20/S22, SBH15/SBH21/SBH25

Core

CRGO Electrical Steel / Amorphous Alloy — Optional

Cooling Method

Onan / Onaf

Winding Type

Two-winding Transformer

Certification

ISO9001-2000, ISO9001, CCC, CE

Usage

Power Transformer, Distribution Transformer

Frequency Characteristics

50 /60 Hz

Shape of Core

Stacked Core

Brand

Yaqing / Lanyu

Rated Capacity

30-2500 kVA

Hv Voltage

10-35kv

LV Voltage

220V / 380V / 415V or Customized

Winding Material

Copper / Aluminum, Optional

Insulation System / Thermal Class

Class a

Hv Tap Range

±2 X 2.5% / ±5%

Impedance

4.0% ~10.0%

Vector Group

Dyn11, Yyn0 / Yzn11

Warranty

24 Months

Transport Package

Export Wooden Case / Steel Base Packing

Specification

Customized

Trademark

Yaqing, Lanyu, OEM, ODM. etc

Origin

China

HS Code

8504210000

Production Capacity

2000 Pieces / Year

Key features

The winding adopts corrugated oil channel , no paint dipping process and tight tape binding ;it can improve the efficiency of the transformer.
30-2500KVA transformer is equipped with pressure relief valve ;It can effectively reduce internal pressure.
The transformer oil tank features corrugated walls that provide both cooling and "breathing" functions, while also compensating for volume changes in transformer oil caused by temperature fluctuations
The transformer uses a vacuum oil filling process,this is an effective method to mitigate transformer performance degradation and oil aging.

Company profile

Business Type: Manufacturer/Factory, Group CorporationExport Year: 2003-12-31Nearest Port: Qingdao portAverage Response Time: ≤7.50hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, CIF, EXW, CFR

About Our Factory & Business Background

AddressNo. 50, Jifa Longshan Road, Environmental Protection Industrial Park, Jimo District, Qingdao, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsDry-Type Transformer, Oil-Immersed Transformer, Smart Grid O&M Services, Industrial Voltage Stabilizer, Prefabricated Substation, Solar PV Combined Substation, Vacuum Circuit Breaker (Vcb), Mv / LV Switchgear, Bess Integration, EMS (Energy Management System)

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Do you accept customized serveice ?
A:
Yes ,absolutely. We offer OEM/ODM services and can print your logo on the product. Our professional technical and maintenance team can provide satisfactory projects based on your drawings and parameters.
Q:What is your Minimum Order Quantity (MOQ) and the typical production lead-time for orders?
A:
We maintain a flexible MOQ starting from 1 set to support various project scales. For standard specifications, the typical production lead-time is approximately 5-10 working days upon receipt of the deposit and final technical confirmation.
Q:How do you solve quality problems?
A:
Please porvide detailed photoes of quality problems. our technical and quality testing depart-ment will analyse.we will make a satisfied soluton within 2 days .
Q:How long is the warranty of your product ?
A:
Our warranty period is two year.
Q:What is your packaging assurance?
A:
We strictly adhere to export-standard packaging to ensure the safety of goods during transit additionally, we are fully flexible and can customize the packaging according to specific customer requirements.

Send Inquiry

*To:Caltex (Shandong) Electrical Technology Co., Ltd.Caltex (Shandong) Electrical Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like