Business Type: Manufacturer/Factory, Trading CompanyAverage Response Time: ≤1.62h
AI-Powered supplier vetting
SummaryThe supplier is a professional technique provider with strong customization capabilities but lacks financial and production capacity. They have a robust R&D focus but have not introduced new products recently. Export activities have just started, and overseas service capabilities are absent. Quality assurance processes are in place, though documentation for after-sales service and supplier management is lacking.
Supplier typeThe supplier is a professional technique supplier with a focus on construction project design, new material technology, and sales of metal products.
Financial creditThe supplier shows no operating revenue, profit, or cash flow activity over the past three years, indicating a lack of financial credibility.
Production capacityThe supplier does not have in-stock service capacity, overseas warehouses, showrooms, or agents, indicating limited production capability.
Customization capabilityThe supplier offers extensive customization services, including full, minor, and flexible customization options.
Product Q&A
Q:Could you please design a new and unique prefab house for me?
A:
Absolutely! We are able to provide you with not only construction scheme, but landscape design! One-stop service is our outstanding superiority with no doubt.
Q:What should I provide to build a prefab house?
A:
So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don't have any. Simply notify us your requirements, such as the area, usage and the stories of the house. Before long, you'll possess an amazing design.
Q:How could I ensure the cost of building a prefab house?
A:
Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
Q:How Long does it take to build a light steel prefab house?
A:
It depends on the size of the house. Generally, one 50 square meter house five workers 1-3days finished installation, save manpower and time
Q:Is it difficult to build a prefab house?
A:
Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool.
Send Inquiry
*To:Suzhou Canhong New Material Technology Co., Ltd
*Content:
0/4000
Supplier replies will be sent to your registered email