SourcingAI
Try for free
Powered by Made-in-China.com
Three-Phase Heat Pump Electric AC Fan Motor with 550W 6 Pole
US$35.00-150.00
100 Pieces
Sample price:US$50.00/piece.Request sample

Product profile

Customization

Available

Application

Suitable for Commercial Split Indoor Ceiling Sucti

Speed

720-950 /Rpm

Model NO.

YS-550-6E

Number of Stator

Three-Phase

Function

Energy Saving, High Efficiency and Low Noise

Casing Protection

Closed Type

Number of Poles

6

Starting Mode

Direct on-line Starting

Certification

ISO9001, CCC, Ce

Brand

Carlyi

Suitable for Central Air Conditioning Fa

IP20

Insulation Class

Class B/F (CCC)

Coil

100% Pure Copper Wire Winding

Bearing

NSK Low Noise High Quality Rolling Bearing

Transport Package

According Customer Requirement

Trademark

CARLYI

Origin

Changzhou Jiangsu China

HS Code

8501400000

Production Capacity

10000pieces/Week

Key features

Customizable Design: Specifications can be designed and manufactured according to customer requirements.
Energy Efficient: Features high efficiency, low noise, and energy-saving operation.
High Quality Bearings: Equipped with NSK low noise high quality rolling bearings.
Pure Copper Windings: Coils are made of 100% pure copper wire winding.
Multiple Voltage Options: Available in 100-120V, 200-240V, and 380V with 50Hz/60Hz frequencies.
Thermal Protection: Includes automatic overload and thermal protection for safety.
Reversible Rotation: Features a reversible plug for easy rotation direction adjustment.
Certified Quality: Approved by ISO9001, CCC, CE, and RoHS certifications.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2019-11-25 CertifiedNearest Port: Shanghai PortAverage Response Time: ≤2.71h CertifiedTerms of Payment: LC, T/T

About Our Factory & Business Background

AddressNo. 10 Chunqiao Road, Xinbei District, Changzhou City, Jiangsu Province, Changzhou, Jiangsu, China
Plant Area2350 square meters
Registered Capital3,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsFan Motor; Brushless DC Motor
Production MachinesCNC Lathe, Winding Machine, Auto Assembly Line, Hydraulic Machine, Drying Oven, Comprehensive Testing Stand, Motor Test System
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2013-05-15
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Domestic
Overseas Agent/BranchNo

Our Certifications, Standards & Industry Recognition

Product CertificationOthers

Product Q&A

Q:Are you a factory?
A:
Yes, we have been in designing and providing excellent motors for customers. Our factory production is all under ISO9001 quality management system.
Q:How long could you prepare samples?
A:
Normally 3 days if we have the sample in hand. If customized one, about a week around.
Q:How about batch order production?
A:
Normally 15-30 days, the customized or newly developed products may take more half month.
Q:Do you inspect the finished products?
A:
Yes, we do inspection according to ISO9001 standard and ruled by our experienced QC staff.
Q:What advantage do you have?
A:
For the motors, we have long enough of 18months guarantee, and for the service, we offer 24 hours technical support and barrier-free communication.

Send Inquiry

*To:Changzhou Jiayi Electric Co., Ltd.Changzhou Jiayi Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like