SourcingAI
Try for free
Powered by Made-in-China.com
Structural Strength Fireproof PU Edge Sandwich Rock Wool Panel Data Center Construction
US$20.00
500-999 Pieces
US$18.00
1,000+ Pieces

Product specifications

Specification

Sample price:US$200.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Installation Guidance on Construction Site

Warranty

as Contract

Model NO.

Rockwool Sandwich Panel CCAT001

Feature

Environmental, Fireproof, Light Weight, Metal Panel

Fire Rating

a

Certification

CCC, ROHS, ISO9001

Customized

Customized

Product Name

Rockwool Sandwich Panel

Keywords

Rock Wool Sandwich Panel

Surface Texture

Emboss/Small Wave/Big Rib/Flat

Material of The Facing Plate

Gl, PPGI, PPGL, Stainless Steel, Alunimum

Paint

PVDF,SMP,HDP,PE

Recommended Plating

+D19 Al-Zn Coate

Color

Any Ral Color

Core Material

Rock Wool, PU+Rock Wool

Core Material Density

Glass Wool: 60-68kg/M3, Rock Wool:100- 120kg/M3

Thickness

30-150mm

Length

Max 11.8m

Cover Width

1150mm/950mm

Transport Package

Standard Packaging or Customized

Specification

Standard Specifications or Customized

Trademark

CCAT

Origin

Xiamen, China

HS Code

7308900000

Production Capacity

50000meters/Year

Company profile

Zhangzhou CCAT Construction Technology Co., Ltd.
Importers and ExportersHigh Repeat Buyers Choice3D Software DesignStandardized quality control
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 7 years CertifiedNearest Port: Xiamen PortAverage Response Time: ≤1.55h

AI-Powered supplier vetting

SummaryCCAT Construction Technology is identified as a professional technical supplier with 3D design, customization, ODM, and OEM capabilities. It operates a 76,000-square-meter factory with stated annual production capacity of approximately 45,000 tons and has valid manufacturing contracts with affiliated subcontractors. Quality and service controls include documented corrective-action and complaint-handling procedures, quality assurance, and raw-material traceability. The supplier holds ISO9001:2015, ISO45001:2018, and ISO14001 certifications. However, it reported no new products in the past year, no available SDK, and lacks overseas warehouses, showrooms, agents or branches. Financial evidence is limited to year labels without performance values, so credibility cannot be fully assessed. Customer-related evidence supports OEM service for well-known brands but does not identify specific customer cases.
Supplier typeThe supplier is explicitly identified as a professional technical supplier and provides technical design and customization services. Its company description identifies it as Zhangzhou CCAT Construction Technology Co., Ltd., operating a steel-structure factory.
CertificationsThe supplier reports holding ISO9001:2015, ISO45001:2018, and ISO14001 certifications. These are explicit certification holdings relevant to quality, occupational safety, and environmental management.
After-Sales capabilityThe supplier provides technical support for after-sales service and has clear, followed procedures for customer complaints and corrective and preventive actions. Quality assurance and raw-material traceability are also documented, supporting structured post-sale issue handling.
Production capacityThe factory covers more than 76,000 square meters with stated production capacity of approximately 45,000 tons per year. It has valid contracts with affiliated subcontractors, in-stock capability, 35 qualified service-capability suppliers, and written supplier-assessment procedures, indicating substantial production and supply-management capacity.
Customization capabilityThe supplier explicitly offers customization from samples, designs, full customization, minor customization, and flexible customization, along with 3D software design, ODM, and OEM services. This indicates broad capability to support both design-based and sample-based customized orders.

Send Inquiry

*To:Zhangzhou CCAT Construction Technology Co., Ltd.Zhangzhou CCAT Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

50mm Insulated Rock Wool Wall Sandwich Panel for Warehouse
Made-in-China.com