SourcingAI
Try for free
Powered by Made-in-China.com
High Quality Competitive Price Data Center Construction Antistatic Raised Floor
US$5.00
2-999 pieces
US$4.00
1,000+ pieces

Product specifications

600*600

Sample price:US$1.00/pieces.Request sample

Product profile

Customization

Available

After-sales Service

Online Technical Guidance

Warranty

1 Year

Model NO.

600*600

Material

Steel

Size

600*600mm

Function

Soundproof

Surface Treatment

Simple Color

Color

Custom Made

Metal Type

Steel

Certification

CE, ISO

Usage

Electrical Factory, Computer Room, Bank, Offices

Advantage

Easy to Use

Customized

Customized

Transport Package

Pallet Packaging

Specification

600*600

Trademark

cwwin

Origin

China

Key features

High Load-Bearing Stability: Manufactured with high-quality steel panels/calcium sulphate core and reinforced pedestal systems, providing excellent concentrated load performance without deformation du
Flexible Cable Management Solution: The raised floor structure provides sufficient underfloor space for power cables, network wiring, HVAC, and fire protection systems, making maintenance easier
Fireproof & Anti-Static Performance: Finished with high wear-resistant anti-static surfaces, offering excellent fire resistance, anti-static protection, and durability to ensure equipment safety
Excellent Underfloor Airflow Performance: Compatible with ventilation panels to improve cooling efficiency and optimize airflow distribution in data centers and clean rooms.
Modular & Easy Maintenance Design: Individual panels can be easily removed and replaced, allowing quick access to underfloor systems and reducing maintenance downtime.
Wide Range of Surface Finishes: Available with HPL, PVC, ceramic, carpet, aluminum, and other finishes to meet different project requirements.
Adjustable Height System: Flexible pedestal system supports various installation heights for complex cable and piping layouts.
Strong Structural Integrity: Precision-engineered panel structure ensures long-term dimensional stability and excellent impact resistance.
Eco-Friendly & Recyclable Materials: Manufactured with environmentally friendly materials that comply with modern green building requirements.
High Precision Panel Flatness: Ensures seamless installation and stable walking comfort with excellent dimensional accuracy.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 13 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤1.45h

AI-Powered supplier vetting

SummaryThe supplier specializes in customization services without offering 3D software design services. They lack new product development in the past year. The supplier handles exports effectively but does not have overseas facilities or participate in offline trade shows. Financial data shows minimal recent activity, questioning their financial credibility. They follow procedures for service capability and complaint handling, suggesting strong after-sales service capability.
Supplier typeThe supplier engages in sales of various building materials, furniture, and hardware products, indicating a focus on building and construction material sales.
After-Sales capabilityThe supplier has established procedures for service capability assessment and handling customer complaints, indicating a structured approach to after-sales service.
Financial creditThe financial data indicates no operating revenues for the past two years, raising concerns about the supplier's financial credibility and stability.
R&D capabilityDespite claims of pursuing technological innovation, there were no new products developed in the past year, indicating limited recent innovation.
Production capacityThe supplier possesses various production facilities, such as pressing and painting machines, indicating a broad production capability for relevant products.
Customization capabilityThe supplier offers a wide range of customization services, including full and minor customization, demonstrating strong customization capabilities.

Product Q&A

Q:who are we?
A:
Established in 2012, we are a professional flooring solution provider based in Jiangsu, China, specializing in the research, development, and sales of flooring products.
Q:Quality Assurance
A:
To ensure consistent product quality, we implement a strict dual-stage quality control system: Pre-production Sample Approval: Samples are provided for customer confirmation before mass production to ensure all specifications and requirements are met. Final Inspection Before Shipment: Every order undergoes a comprehensive final inspection to ensure that only qualified products are delivered to our customers.
Q:Our Main Products
A:
We offer a wide range of professional flooring solutions, including: Raised Access Floor Anti-static Floor Access Floor System Calcium Sulphate Raised Floor Air Flow Panel / Ventilated Panel
Q:Why Choose Us
A:
Professional manufacturer with over 10 years of industry experience Strict quality control system Global export experience Customized solutions available Responsive technical and sales support
Q:Sample Support
A:
We are pleased to provide free samples for evaluation. Samples allow customers to assess product quality and specifications before placing an order.

Send Inquiry

*To:CHANGZHOU HYL FLOOR CO., LTD.CHANGZHOU HYL FLOOR CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Customized Anti-Static Data Center Raised Floor

Customized Anti-Static Data Center Raised Floor

US$8.00-15.00
200 Square Meters(MOQ)
Made-in-China.com