SourcingAI
Try for free
Powered by Made-in-China.com
Small Hydro Generator Francis Turbine Generator Price
US$66,600.00
1 Set
Sample price:US$66600.00/set.Request sample

Product profile

Customization

Available

After-sales Service

Free Technical Guidance

Warranty

1 Year

Model NO.

CJA237/475-W

Output Type

AC Three Phase

Size

Large

Type

Horizontal Hydro Generator

Bearing Support

Umbrella Type

Speed

High Speed

Bearing Number

3

Standard

Standard

Net Head

375m

Flow Rate

0.65m3;/S

Rated Rotating Speed

1000r/Min

Efficiency of Turbine

89.5%

Efficiency of Generator

93.5%

Generator Type

Sfw-W750-6/990

Governor

High Hydraulic Microcomputer

Valve

Butterfly Valve / Gate Valve

Excitation Device

5 in 1 Integrated Control Panel

Keyword

Pelton Turbine

Transport Package

Wood Box

Specification

15-30 cubic

Trademark

Forster

Origin

China

HS Code

8502390010

Production Capacity

50pieces/Year

Key features

High Efficiency Turbine: Turbine efficiency reaches 89.5% with smooth efficiency changes across a wide operating range.
Compact Unit Structure: Designed for small investment, simple construction, and stable operation without cavitation issues.
Suitable for High Head: Ideal for mountainous areas with high head, small flow, and large runoff variations.
Comprehensive Product Range: Offers Kaplan, Turgo, Tubular, Francis, and Pelton turbine series plus auxiliary equipment.
Turnkey EPC Services: Provides full EPC services including design, manufacturing, construction, commissioning, and maintenance.
Direct Connection Design: Features direct connection method with horizontal 2-point support for stability.
1-Year Warranty Coverage: Includes a 1-year warranty period with free technical guidance for all units.
Low MOQ Requirement: Accepts a minimum order quantity of just 1 set for flexible purchasing.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2013-01-01 CertifiedNearest Port: Shanghai PortAverage Response Time: ≤2.48h CertifiedTerms of Payment: LC, T/T, D/P, etc. CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW

About Our Factory & Business Background

AddressBuilding No. 4. Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu, Sichuan, China
Number of Employees24
Registered Capital1,000,000 RMB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsHydro Turbine, Water Turbine, Francis Hydro Turbine, Pelton Turbine, Bulb Tubular Turbine, Turgo Turbine, Axial Flow Turbine, Hydro Generator, Hydroelectric Generator, Alternative Energy Generators

Our Industry Experience & Global Business Record

Year of Establishment2013-07-03
Main MarketsNorth America, South America, Europe, Africa, Domestic
Number of Foreign Trading Staff10
Overseas Agent/BranchNo

Our Certifications, Standards & Industry Recognition

Product CertificationCE

Product Q&A

Q:Which turbine should I choose?
A:
Please tell me the water head, flow rate, frequency, Total power you need , voltage, on grid or off grid operation, we will propose a solution.
Q:Can your factory provide all the equipment for hydropower generation?
A:
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q:Can you do EPC for a hydroelectric power plant?
A:
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q:Is your company a trading company or a manufacturer?
A:
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q:What is an acceptable MOQ?
A:
For this product, our acceptable MOQ is 1 set.

Send Inquiry

*To:Chengdu Forster Technology Co., Ltd.Chengdu Forster Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Small Hydro Power Project EPC Francis Turbine Generator Hpp
Made-in-China.com
3 Phase 3kw 5kw 10kw Hydro Water Turbine Generator Price
Made-in-China.com