SourcingAI
Try for free
Powered by Made-in-China.com
Multi-Purpose MDF Craft Organizer Stand for Quick Access
US$50.00-80.00
100 Pieces
Sample price:US$100.00/piece.Request sample

Product profile

Customization

Available

Display Products

Money

Material

Wood

Model NO.

CR-MDF-046

Display Place

Indoor

Usage

Supermarkets and Stores

Antitheft

Not Antitheft

General Use

Commerical

Color

Customized

Size

Customized

Sample Time

5-7days

Delivery Time

25-30days

Appearance

Modern

Transport Package

Express Safe Packing

Specification

Customized

Origin

Shenzhen

HS Code

940360

Production Capacity

50000

Key features

Customized Design & Size: Color and size are fully customizable to meet specific brand needs.
Multi-Material Options: Available in Metal, Wood, Acrylic, MDF, PVC, and other materials.
Free Design Service: Professional engineers provide free artwork design and feasibility evaluation.
Fast Sampling Time: Sample production takes only 5-7 days for quick verification.
Versatile Application: Ideal for supermarkets, malls, exhibitions, and trade shows.
Secure Packaging: Custom packing ensures products arrive in good condition.

Company profile

Shenzhen Centroyal Metal & Plastic Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceYears of Export Experience
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 15 Years CertifiedNearest Port: Shenzhen PortAverage Response Time: ≤2.91h

AI-Powered supplier vetting

SummaryCentRoyal is identified as a combined company with manufacturing facilities covering EDM, grinding, injection molding, and milling. It demonstrates documented quality-control, complaint-handling, corrective/preventive-action, finished-product inspection, R&D, and design processes. The supplier offers broad customization and 3D software design, reports new products within the past year, and states a 5–10 day lead time with fast quotation and response. However, the evidence shows no valid manufacturing-capacity contract with affiliated subcontractors, no overseas warehouse, showroom, agents, branches, or offline trade-show participation. Financial information is limited to year labels and does not establish credibility. No customer cases or certifications are explicitly documented.
Supplier typeThe supplier is explicitly classified as a combined company and is not identified as an offshore company. The provided information does not further specify its legal ownership or organizational structure.
After-Sales capabilityThe supplier has clear procedures and follow-up records for corrective and preventive actions and customer complaints, and states that engineers provide technical support for after-sales service. Its description also cites reliable after-sales service, supporting a documented service capability.
R&D capabilityThe supplier reports new products within the past year, provides 3D software design services, and assigns engineers responsibility for new product development. Audit-ready R&D design and validation documentation is also stated, indicating an established innovation process.
Production capacityProduction capability is supported by multiple listed facilities, a stated 5–10 day lead time, a professional production-management system, trained workers and equipment, inventory capability, and standardized finished-product inspection instructions. A limitation is the absence of a valid manufacturing-capacity contract with affiliated subcontractors.
Customization capabilityThe supplier explicitly offers customization from samples, designs, full customization, minor customization, and flexible customization, together with 3D software design services. This demonstrates broad customization coverage.

Product Q&A

Q:What materials can you handle?
A:
We handle Metal (Stainless steel, Steel, Aluminum, Brass), Plastic (Acrylic, PVC, PC, PE, PP, ABS), and Timber (Solid wood, MDF, Plywood, Bamboo).
Q:What is the sampling lead time and fee?
A:
The sampling lead time is normally 5-7 days, and the sampling fee is triple the unit price.
Q:What are the payment terms?
A:
T/T payment term, normally 30% deposit after placing PO, and 70% at the copy of BOL.
Q:What is the mass production lead time?
A:
For new products, it takes 30 days including tooling. For repeat orders, the lead time is 25 days.
Q:How can I get a rough price?
A:
Provide a raw design idea, general sizes, and the products to be displayed. Our engineer will create a drawing and quote.

Send Inquiry

*To:Shenzhen Centroyal Metal & Plastic Co., Ltd.Shenzhen Centroyal Metal & Plastic Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like