SourcingAI
Try for free
Powered by Made-in-China.com
5nm3/H - 1000nm3/H Containerized Water Electrolysis Hydrogen Generator with Non Metallic Frame Stack
US$60,000.00-1,000,000.00
1 Set

Product profile

Customization

Available

Application Fields

Chemical, Electronic, New Energy, Petroleum

Certification

CE, ISO

Model NO.

CHV

Condition

New

Noise Level

Low

Parts

Gas Tank

Purpose

Gas Manufacturing

Types

Water Electrolysis Hydrogen Production Machine

Technology

Alkaline

Purity

up to 99.999%

Pressure

up to 16bar

Control Mode

PLC Control

DC Power Consumption

≤4.5 Kwh/Nm2 H2

Stack Warranty

3 Years

Polar Frame

Non Metallic

Customized

Yes

Structure

Cabinet Type, Split Type and Container Type

Transport Package

Wooden Case

Trademark

COCH

Origin

China

HS Code

8405100000

Key features

Non-Metallic Frame Stack: Avoids electro-corrosion, reduces weight by 50%, and eliminates toxic V2O5 usage for safety and eco-friendliness.
High Purity Output: Produces hydrogen with up to 99.999% purity using advanced alkaline water electrolysis technology.
Low Degradation Rate: Ensures long-term stability with less than 5% degradation over 10 years of continuous operation.
Renewable Energy Compatible: Utilizes multiple stacks with BOP to enlarge load range, adapting to varying renewable energy inputs.
Comprehensive Safety Monitoring: Equipped with H2, O2, O2 in H2, and dew point analyzers for real-time data monitoring and safety assurance.
Global Certification: Certified by EU CE and ISO9001, with exports to 24 countries including US, EU, Russia, Japan, and South Korea.
High Pressure Boosting: Features booster systems increasing pressure from initial 1.6MPA to final 35MPA within 30MIN-24H.

Company profile

Wenzhou Gaoqi Hydrogen Energy Technology Co., Ltd.
Years of Export ExperiencePatents Awarded100% Finished Products InspectionManagement Certification
Business Type: Manufacturer/FactoryExport Year: 2017-06-30Nearest Port: Ningbo, ShanghaiAverage Response Time: ≤0.54hTerms of Payment: T/TInternational Commercial Terms(Incoterms): FOB, EXW

About Our Factory & Business Background

Address#209 Wei 5 Road, Yueqing Industry Zone
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months

Our Production Capability & Technical Expertise

Main ProductsHydrogen Generator, Hydrogen Equipment, Electrolyzer, Hydrogen Plant

Our Industry Experience & Global Business Record

Main MarketsNorth America, Eastern Europe, Southeast Asia, Mid East, Western Europe, Eastern Asia

Product Q&A

Q:Why do you use Non-metallic Frame for Stack?
A:
First, for safety concerns. Metallic frame is made of steel with Nickel plating. When KOH lye goes through the stack, there is electro-corrosion happening in the metallic frame. There is risk that hydrogen and oxygen combined in the stack. Non-metallic frame can avoid this problem. Second, for shipping concerns. Non-metallic frame stack is 50% lighter and smaller than metallic frame stack. Better and cheaper for shipping. Third, for environmental concerns. Metallic frames need Nickel plating. It
Q:What's your degradation?
A:
For continuous operation, our 10 years degradation is less than 5%.
Q:How can we monitor safety data?
A:
We have H2 analyzer, O2 analyzer, O2 in H2 analyzer and dew point analyzer to monitor data. Please calibrate analyzers once three months.
Q:How to compatible electrolyzers with renewable energy?
A:
We use multiple stacks working with BOP to enlarge load range. Customized project will be based on different inquires of load.

Send Inquiry

*To:Wenzhou Gaoqi Hydrogen Energy Technology Co., Ltd.Wenzhou Gaoqi Hydrogen Energy Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like