SourcingAI
Try for free
Powered by Made-in-China.com
Cheap 10L Industrilal Cooling System for TIG Welder (CT-10W)
US$117.00-156.00
10 Boxes
Sample price:US$150.00/box.Request sample

Product profile

Customization

Available

Type

Water-Cooled

Cooling Water

Industrial Water

Model NO.

CT-10(W)

System Type

Closed System

Fans Species

Single-speed Fan

Noise Level

Low

Application Fields

Welding

Certification

ISO, CE, Eac

Condition

New

Water Capacity

10L

Machine Power

100W

Lead Time

3 Working Days

Operator Manual

Included

Max.Flow

20L/Min

Max.Lift

10m

Cooling Power(1L/Min)

1.6kw

N.W

18kg

Supply Voltage

220V

Transport Package

Cartons

Specification

62*40*45cm

Trademark

CHD

Origin

Shanghai

HS Code

8515900000

Production Capacity

1000 Set /Month

Key features

Customizable Specifications: Technology specs can be customized according to customer needs.
High-Temperature Resistant: Coolant tank formed with high temperature resistant material to prevent leakage.
Low Noise Operation: Features a single-speed fan with low noise level for quiet performance.
Multiple Certifications: Holds ISO, CE, and EAC certifications; other certificates available upon request.
Versatile Application: Suitable for TIG welders, arc welding robots, and CNC plasma cutting machines.
Fast Lead Time: Standard lead time is 3 working days for quick delivery.
Professional Manufacturer: High-tech enterprise with over 30 years of experience and national patents.
Full Customization Support: Offers full, minor, and flexible customization from designs or samples.

Company profile

SHANGHAI CHD WELDING & CUTTING EQUIPMENT CO., LTD.
High Repeat Buyers ChoiceYears of Export ExperienceExperienced TeamSelf-branded
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 22 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤10.25h

About Our Factory & Business Background

AddressNo. 305, South Shengxin Road, Jiading District, Shanghai, China
Plant Area24000 square meters
Number of Employees59
Registered Capital12,000,000 RMB
Terms of PaymentLC, T/T, PayPal, Small-amount payment, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners45

Our Production Capability & Technical Expertise

Main ProductsCNC Cutting Machine, Plasma Cutting Machine, Gas Cutting Machine, Pipe Cutting Machine, H-Beam Cutting Machine, Welding Machine, Flame Cutting Machine, MIG Welding Machine, TIG Welding Machine
Production Lines3
Production MachinesCNC Gear Shaper, CNC Lathe, CNC Machining Center, Drilling Machine, Laser Cutting Machine, CNC Punching Machine
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers7 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2001-04-18
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:Can the product specifications be customized?
A:
Yes, the technology specifications can be customized according to customer needs.
Q:What certifications does the cooling system have?
A:
It comes with ISO, CE, and EAC certifications. Other product certifications or certificates of origin can be applied for based on customer needs.
Q:What is the lead time for this product?
A:
The standard lead time is 3 working days. For peak seasons, the lead time is one month, while off-season lead time is also one month.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Q:Is OEM or ODM service available?
A:
Yes, both OEM and ODM services are available, including full, minor, and flexible customization from designs or samples.

Send Inquiry

*To:SHANGHAI CHD WELDING & CUTTING EQUIPMENT CO., LTD.SHANGHAI CHD WELDING & CUTTING EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

New Type 10L Liquid Cooling System for Welder
Made-in-China.com
Rail Cooling System for Trains and Emus with Centrifugal Fan
Made-in-China.com
Water Cooling System for Cooling The Torch TIG
Made-in-China.com
Immersion Cooling System for Bitcoin Mining Units
Made-in-China.com