SourcingAI
Try for free
Powered by Made-in-China.com
Second Hand Cool Runner Plastic Ash-Bin/ Dustbin Used Mould/Mold
US$2,500.00-3,000.00
1 Piece

Product profile

Customization

Available

Shaping Mode

Injection Mould

Surface Finish Process

Polishing

Model NO.

dustbin mould

Mould Cavity

Single Cavity

Plastic Material

HDPE

Process Combination Type

Compound Die

Application

Commodity, Home Use

Runner

Hot Runner

Design Software

AutoCAD

Installation

Fixed

Certification

CE

Standard

DME

Customized

Customized

Payment

T/T, L/C

Polishing Level

Can Make According to Client's Request

OEM/ODM

Available

Heat Treatment

Nitriding,etc

Quality Control

in House Professional QC

Mould Water Cooling

by Experienced Designer

Transport Package

Wooden Case

Specification

steel

Trademark

D-R

Origin

Taizhou Huangyan

HS Code

8480790090

Production Capacity

200-500PCS

Key features

Customized Design Service: OEM/ODM available with DFM reports and moldflow analysis for complex designs.
Fast Mold Design: Design completed within 1-3 working days after receiving customer drawings.
High-Quality Materials: Mold made from P20, 718, H13, NAK80, S136, and other premium steel grades.
Rigorous Quality Control: In-house professional QC with video testing available before shipment.
Flexible Payment Terms: Supports T/T, L/C, Western Union, and Money Gram for secure transactions.
Lifetime Warranty: Life-long guarantee provided for all molds to ensure long-term reliability.
Versatile Runner Options: Supports YUDO, hot runner, cold runner, and various gate types like edge gate.
Small Order Accepted: Minimum order quantity is flexible; small orders can be accepted.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-12-28Nearest Port: Ningbo, ShanghaiAverage Response Time: ≤7.04hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressNo. 362, Lingxiage Village, Xicheng Street, Huangyan, Taizhou, Zhejiang, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsBlow Moulding Machine, Plasitc Inject Machine, Preform Mould, Commodity Mould, Pet Preform, Second Hand/Used Mould

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the lead time for mold production?
A:
It typically takes 15-60 days depending on design complexity. After design confirmation, plastic molds take 2-7 weeks.
Q:Can you provide OEM or ODM services?
A:
Yes, OEM/ODM services are available. We offer part design analysis, DFM reports, and moldflow reports for complex products.
Q:What materials are used for the mold?
A:
We use high-quality steel materials including P20, 718, 2738, H13, NAK80, 1.2344, 2343, and S136.
Q:What is the warranty period for the mold?
A:
We provide a life-long guarantee for our molds to ensure durability and customer satisfaction.
Q:What are the payment terms?
A:
We accept T/T, L/C, Western Union, and Money Gram for payment.

Send Inquiry

*To:Taizhou Doria Plastic Equipments Co., Ltd.Taizhou Doria Plastic Equipments Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like