SourcingAI
Try for free
Powered by Made-in-China.com
Floating Fountain in Scenic Area - Shuoying Customized Pricing Options
US$1,260.00-8,600.00
1 Set
Sample price:US$150.00/piece.Request sample

Product profile

Customization

Available

Control System

Customized

Height Range

Customized

Model NO.

custom-made

Installation Types

Customized

Lighting Effects

Customized

Music Options

Customized

Power Supply

Customized

Water Features

Jets

Water Patterns

Customized

Transport Package

Wooden Box

Specification

Customized

Trademark

Shuoying

Origin

China

Production Capacity

50000pieces/Year

Key features

Customized Control System: Control system tailored to specific project requirements.
Customized Height Range: Height adjustable to fit various scenic area specifications.
Customized Installation Types: Flexible installation methods for different environments.
Customized Lighting Effects: Lighting patterns and colors designed to match themes.
Customized Music Options: Audio systems synchronized with water and light displays.
Customized Power Supply: Power configurations adapted to local electrical standards.
Customized Water Patterns: Unique water shapes and flows created on demand.
Manufacturer Direct Supply: Direct sales from manufacturer with competitive pricing.

Company profile

Hebei Shuoying Landscape Engineering Co., Ltd.
Self-brandedFast DeliveryQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading CompanyExport Year: 2022-08-02Nearest Port: TJAverage Response Time: ≤0.01hTerms of Payment: D/PInternational Commercial Terms(Incoterms): FOB

AI-Powered supplier vetting

SummaryThe supplier is identified as a trading company operating in the construction-related sector, with business covering landscaping, municipal facilities, urban greening, lighting fixtures, building materials, hardware, and related products. It reports OEM capability for popular brands, flexible customization, two production lines, stated dance-fountain output of 50 sets, and lead times within 15 workdays in both peak and off-peak seasons. Quality assurance is reported, supported by 6–10 quality-control staff, but finished products are checked by packing staff. Major control and service gaps include no written corrective/preventive-action or complaint-handling procedures, no continuous batch quantity reconciliation, no outsourcing SOP, no valid contracts with related subcontractors, and no inventory or overseas warehouse capability. R&D experience is limited to two years and no SDK is available. Financial records are referenced for 2023–2025, but their contents are not provided. No customer cases or...
After-Sales capabilityThe supplier has no written procedures or records for corrective and preventive actions or effective customer-complaint handling. It also reports no in-stock service capacity, overseas warehouse, or overseas showroom, indicating documented weaknesses in structured after-sales support and overseas service infrastructure.
R&D capabilityThe supplier reports two years of R&D engineer experience and explicitly has no available SDK. Although it offers product customization, the evidence does not establish strong product-development or technology-integration capability.
Production capacityThe supplier reports two production lines, 50 dance-fountain sets as annual output information, and lead times within 15 workdays in both peak and off-peak seasons. However, it lacks continuous batch quantity reconciliation, an outsourcing SOP, valid contracts with related subcontractors, and inventory capacity, so production controls and fulfillment resilience are deficient despite the stated capacity.
Customization capabilityThe supplier explicitly offers customization from samples, designs, full customization, minor customization, and flexible customization, and reports OEM service for popular brands. These statements provide direct evidence of broad customization and OEM capability.

Product Q&A

Q:Is the listed price the final price?
A:
No, the listed price is a starting point. You must contact customer service to confirm the final price, shipping costs, and specifications before payment.
Q:How long does production take?
A:
As a custom-made product, the lead time varies. Peak season takes within 15 workdays, while off-season takes 6-12 months. The exact date is determined by mutual negotiation.
Q:Can I return or exchange the product?
A:
Returns and exchanges are not accepted for custom-made orders once production has started, unless there is a verifiable quality defect.
Q:What should I do if the product is damaged upon arrival?
A:
You must inspect the goods immediately upon receipt. If there is severe damage, report it on the spot to the carrier and notify the store. Liability ends once the shipment is signed for without noted discrepancies.
Q:Are there manufacturing tolerances?
A:
Yes, products are subject to standard manufacturing tolerances and minor process variations. Orders with zero tolerance for variations are not recommended.

Send Inquiry

*To:Hebei Shuoying Landscape Engineering Co., Ltd.Hebei Shuoying Landscape Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Decorative Floating Water Fountain for Parks and Scenic Areas
Made-in-China.com
Multimedia Music Fountain Project in Vietnam 2024

Multimedia Music Fountain Project in Vietnam 2024

US$500,000.00-600,000.00
1 Set(MOQ)
Made-in-China.com