SourcingAI
Try for free
Powered by Made-in-China.com
Shuoying Large Water Curtain Fountain - Customized Floating Feature
US$1,688.00-16,800.00
1 Set
Sample price:US$150.00/piece.Request sample

Product profile

Customization

Available

Design

Abstract, Asian-Inspired, Modern, Nature-Inspired, Traditional

Installation

Customized

Model NO.

custom-made

Material

Stainless Steel

Power Source

Electric

Size

Customized

Type

Customized

Water Flow

Gentle

Water Flow Type

Morning Glory

Transport Package

Wooden Box

Specification

Customized

Trademark

Shuoying

Origin

China

Production Capacity

50000pieces/Year

Key features

Customized Installation: Installation is fully customized to fit specific site requirements.
Customized Size: Size dimensions are tailored to customer specifications.
Customized Type: Product type is adjustable based on project needs.
Stainless Steel Material: Constructed from durable stainless steel for longevity.
Gentle Water Flow: Features a gentle water flow type for a serene effect.
Morning Glory Flow Type: Utilizes the Morning Glory water flow pattern.
Electric Power Source: Operates using electric power for efficient performance.
Multiple Design Styles: Available in Abstract, Asian-Inspired, Modern, Nature-Inspired, and Traditional designs.

Company profile

Hebei Shuoying Landscape Engineering Co., Ltd.
Self-brandedFast DeliveryQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading CompanyExport Year: 2022-08-02Nearest Port: TJAverage Response Time: ≤0.01hTerms of Payment: D/PInternational Commercial Terms(Incoterms): FOB

AI-Powered supplier vetting

SummaryThe supplier is identified as a trading company operating in the construction-related sector, with business covering landscaping, municipal facilities, urban greening, lighting fixtures, building materials, hardware, and related products. It reports OEM capability for popular brands, flexible customization, two production lines, stated dance-fountain output of 50 sets, and lead times within 15 workdays in both peak and off-peak seasons. Quality assurance is reported, supported by 6–10 quality-control staff, but finished products are checked by packing staff. Major control and service gaps include no written corrective/preventive-action or complaint-handling procedures, no continuous batch quantity reconciliation, no outsourcing SOP, no valid contracts with related subcontractors, and no inventory or overseas warehouse capability. R&D experience is limited to two years and no SDK is available. Financial records are referenced for 2023–2025, but their contents are not provided. No customer cases or...
After-Sales capabilityThe supplier has no written procedures or records for corrective and preventive actions or effective customer-complaint handling. It also reports no in-stock service capacity, overseas warehouse, or overseas showroom, indicating documented weaknesses in structured after-sales support and overseas service infrastructure.
R&D capabilityThe supplier reports two years of R&D engineer experience and explicitly has no available SDK. Although it offers product customization, the evidence does not establish strong product-development or technology-integration capability.
Production capacityThe supplier reports two production lines, 50 dance-fountain sets as annual output information, and lead times within 15 workdays in both peak and off-peak seasons. However, it lacks continuous batch quantity reconciliation, an outsourcing SOP, valid contracts with related subcontractors, and inventory capacity, so production controls and fulfillment resilience are deficient despite the stated capacity.
Customization capabilityThe supplier explicitly offers customization from samples, designs, full customization, minor customization, and flexible customization, and reports OEM service for popular brands. These statements provide direct evidence of broad customization and OEM capability.

Product Q&A

Q:Is the listed price the final price?
A:
No, the listed price is a starting point. You must contact Customer Service to confirm the final price, shipping costs, and specifications before payment.
Q:How is the production lead time determined?
A:
Since products are custom-made, the lead time varies. It is determined through mutual negotiation based on actual circumstances, with peak season times within 15 workdays and off-season times ranging from 6 to 12 months.
Q:What should I do if the product is damaged upon delivery?
A:
You must inspect the goods on the spot. If there is severe deformation or damage, contact the store immediately. Once signed for, the store assumes no liability for such damages.
Q:Can I return or exchange a custom-made order?
A:
No, custom-made products cannot be resold once produced. Returns or exchanges are only accepted if there is a verifiable quality defect.
Q:Are there manufacturing tolerances?
A:
Yes, products are subject to standard manufacturing tolerances and minor process variations. Customers with zero tolerance for variations are advised not to order.

Send Inquiry

*To:Hebei Shuoying Landscape Engineering Co., Ltd.Hebei Shuoying Landscape Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Outdoor Large Lake Floating Water Project Fountains
Made-in-China.com
Water Features Floating Fountain by Experienced Factory
Made-in-China.com