SourcingAI
Try for free
Powered by Made-in-China.com
Rapid Low-Temperature Closed-Cup Flash Point Tester
US$7,000.00-8,000.00
1 Piece

Product profile

Customization

Available

Display

Digital

Control

Manual Control

Model NO.

GD-5208D

Weight

0-100Kg

Power Source

AC220V

Product Name

Low Temperature Flash Point Test Apparatus

Standard

ASTM D93

Test Sample

Colored Paints;Oil Paints;Solvents and Petroleum

Temperature Range

-30~50 Celsius

Ignition Mode

Manual

Temperature Display

LCD

Printing

Yes

Comminication Port

No

Sample Cup

2ml

Dimension

370*280*280mm

Transport Package

Wooden Case Gd-5208

Trademark

GOLD

Origin

China

Production Capacity

100 Piece/Pieces Per Month

Key features

Semiconductor Refrigeration: Adopts semiconductor cooling with external water cycle for rapid cooling rates.
Minimal Sample Requirement: Requires only 2ml for liquid samples and 4ml for solid/semi-solid samples.
Automatic Result Printing: Test results are automatically printed without manual intervention.
Standard Compliance: Designed per GB/T 5208-2008, ASTM D93, ISO1523, and ISO3679 standards.
Versatile Application: Suitable for paints, solvents, petroleum, adhesives, and oil products.
Compact Design: Small size with dimensions of 490mm x 520mm x 390mm for easy operation.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2008-05-03Nearest Port: Chongqing, ShanghaiAverage Response Time: ≤5.54hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, CPT

AI-Powered supplier vetting

SummaryChongqing Gold Mechanical & Electrical Equipment Co., Ltd. is identified as both a trading company and manufacturer/factory in China, with stated capabilities in oil, electrical, fire, and measuring equipment. Evidence indicates more than 10 production lines, 11–20 R&D engineers, 11–20 quality-control staff, and 50 total staff. The supplier holds ISO 9001 certification, has self-operated import/export rights, and reports peak- and off-peak-season lead times within 15 working days. It describes international sales coverage across multiple regions and adherence to ISO, ASTM D, IP, and GB standards. However, the provided information does not establish after-sales procedures, customization services, or specific customer case details. Financial credibility cannot be assessed because financial data is excluded from this analysis.
Supplier typeThe supplier is explicitly described as a factory and as both a trading company and manufacturer/factory. Its stated business involves researching, designing, developing, and producing scientific and measuring instruments, supporting classification as a manufacturing-oriented supplier.
CertificationsThe supplier explicitly reports ISO 9001 certification and states that manufacturing follows ISO, ASTM D, IP, and GB standards. ISO 9001 is direct evidence of a certified quality-management system, while the standards statement supports structured manufacturing compliance.
R&D capabilityThe supplier describes itself as a high-tech enterprise engaged in research, design, development, and production, with 11–20 years of total R&D-engineer experience and stated continuous innovation. These details explicitly support an established innovation function.
Production capacityThe supplier reports more than 10 production lines, 11–20 quality-control staff, 50 total staff, and lead times within 15 working days in both peak and off-peak seasons. Its described manufacturing scope covers oil testers, electrical testers, fire-testing equipment, and oil purifiers, providing direct evidence of operational production capacity.

Product Q&A

Q:How much sample is needed for testing?
A:
It requires only 2ml for liquid samples and 4ml for solid or semi-solid samples.
Q:What standards does this apparatus comply with?
A:
It is designed according to GB/T 5208-2008, ASTM D93, ISO1523, and ISO3679.
Q:Does the device print test results automatically?
A:
Yes, the determination procedure is automatic except for ignition, and results are printed automatically.
Q:What is the cooling method used?
A:
It uses a semiconductor refrigeration device with an external water cooling cycle.
Q:What is the lead time for delivery?
A:
The lead time is within 15 workdays for both peak and off-peak seasons.

Send Inquiry

*To:Chongqing Gold Mechanical & Electrical Equipment Co., Ltd.Chongqing Gold Mechanical & Electrical Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Automatic Closed cup flash point tester for ASTM D93
Made-in-China.com
Pensky-Martens Closed Cup Flash Point Tester ASTM D93
Made-in-China.com