CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2002-09-03 CertifiedNearest Port: Shenzhen PortAverage Response Time: ≤15h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo.701 Building3, Onemall Fist International, Dongguan, Guangdong, China
Plant Area15000 square meters
Number of Employees82
Registered Capital26,745,650 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsPP Yarn, Polyester Thread, PP Twine Baler Twine PP Film Rope, All Kinds of Thread, Cable Filler Yarn
Production MachinesOven, Tension Tester, Specific Gravity Tester, Hardness Tester, Electric Thermostatic Water Bath, Oxygen Index Tester, Mixer, straightening Machine, Winding Machine, Twisting Machine, PVC Production Line, Paper Rope Machine, High Flame Retardant Filling Rope High Speed Production Line, High Flame Retardant Filling Rope Combining Machine
R&D Engineers5 people
Test Reports for Raw MaterialsReach, Others
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2002-04-18
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
Our Certifications, Standards & Industry Recognition
Product CertificationUL
Product Q&A
Q:What is the material composition of the filler yarn?
A:
The yarn is made of 100% Polypropylene or PP mixed with CaCO3.
Q:Is the product flame retardant?
A:
Yes, it is available in Flame Retardant (FR) and Low Smoke Zero Halogen (LSOH) versions.
Q:What are the available size and denier options?
A:
Size ranges from 0.8mm to 30mm, and denier ranges from 1000d to 1000000d.
Q:How long is the shelf life of the product?
A:
The shelf life is 18 months from the manufacturing date if stored properly.
Q:What are the lead times for production?
A:
Lead time is within 15 working days for both peak and off-peak seasons.
Send Inquiry
*To:Jiangxi Longtai New Material Co., Ltd.
*Content:
0/4000
Supplier replies will be sent to your registered email