SourcingAI
Try for free
Powered by Made-in-China.com
68 Sqm Prefab House Prefabricated House with EPS Sandwich Panel
US$100.00-200.00
100 Square Meters
Sample price:US$10.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

10 Years

Material

Steel Structure

Model NO.

QDSM-192

Surface Treatmen

Galvalume, Az275

Tolerance

+-2mm

Material Grade

G550/G350

Insulation

Polyurethane, Rockwool, Glasswool, EPS

Accessories

Aluminum Window, Thermal Broken Door

Wind Load

285 Km/Hour 180 Miles/Hour

Snow Load

Max. 200 Kg/Sqm

Earthquake Scale

Ritcher 8

Warranty

5 Years

Usage

Dormitories, Warehouse, Villa, Temporary Offices, Workshop

Certification

CE, ISO

Customized

Customized

Transport Package

Bundled by Steel Belt / Pallet

Specification

Customized

Trademark

QDSM

Origin

China

HS Code

73089000

Production Capacity

1000 Sets/Year

Key features

Customized Design Capability: Full customization for size, color, and layout based on client requirements using Auto CAD and 3DMAX.
Earthquake Resistance: Withstands 9 rare earthquakes and suitable for seismic intensity above 8 on the Richter scale.
Wind Resistance: Resistant to 70m/s hurricanes with a maximum wind speed capacity of 280km/h.
Long Service Life: Main steel structure lasts more than 50 years with hot galvanized and power coated treatment.
Superior Insulation: Thermal resistance reaches 3.2m2K/W, 11 times better than traditional buildings of same thickness.
Fast Installation: Assembly saves 2/3 construction period compared to traditional structures; 50sqm house takes 1-3 days.
Eco-Friendly Materials: Over 90% of steel structure materials are recyclable with non-toxic and odorless insulation.
Energy Efficiency: Heating and cooling energy requirements are 65% lower than traditional buildings.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2010-09-10 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤7.44h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressFuan Second Industrial Park, Jiaozhou City, Qingdao, China
Plant Area6000 square meters
Number of Employees20
Registered Capital1,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Structure Workshop, Builtup H Beam, Welded Tee Beam, Steel Structure Frame, Prefabricated Building
Production MachinesCNC Flame Cutting Facility, Assembly Welding Facility, Auto Sub-merged Arc Welding Facility, Shearing Facility, Drilling Facility
R&D Engineers1 people

Our Industry Experience & Global Business Record

Year of Establishment2018-03-12
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
Number of Foreign Trading Staff2
Overseas Agent/BranchNo

Product Q&A

Q:Do you have the Engineer team to design the steel villa for me?
A:
Absolutely! We are able to provide you with not only construction scheme , but landscape design! One-stop service is our outstanding superiority with no doubt.
Q:What should I provide to build a steel villa?
A:
if you have the plan layout, it will be easier for us. If not, pls inform the wind speed, snow load, building dimension W X L X H, Rainfall capacity, Earthquake scales, etc. then we will design for you as request.
Q:What is the processing for placing order of villa house?
A:
Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation. As cost agreed, then you arrange the down payment for production, after produced ready, we arrange the delivery, then you pay the balance, after that, we will send the guide installation drawings to you help for erection the house.
Q:How Long does it take to build a light steel prefab house?
A:
It depends on the size of the house. Generally, one 50 square meter house five workers 1-3days finished installation, save manpower and time
Q:Is it difficult to build a steel villa ?
A:
Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool.

Send Inquiry

*To:QINGDAO SUPERM STEEL CO., LTD.QINGDAO SUPERM STEEL CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Modular /Mobile/Prefab/Prefabricated House for Private Living
Made-in-China.com
Prefabricated Resort Vacation Rental Luxury Prefab House
Made-in-China.com
Two Bedroom Luxury Prefab Holiday House with Bathroom

Two Bedroom Luxury Prefab Holiday House with Bathroom

US$20.00-24.00
500 Square Meters(MOQ)
Made-in-China.com