Powered by Made-in-China.com
Reliable Metallurgical Feeding System for Optimal Material Flow
US$70,000.00-110,000.00
1 Set
Product specifications
Electrode Column
Product profile
Certification
CE, ISOPlace Style
VerticalRange of Applications
IndustrialModel NO.
ZB-EAFType
Electric Arc FurnaceUsage
Steel MakingFuel
ElectricFeature
Energy SavingUse
for Smelting FurnacesMaterial
Ss,Carbon Steel,CopperInstallation
Guide InstallationLead Time
120-150daysTransport Package
CustomizedSpecification
CustomizedTrademark
NoOrigin
ChinaHS Code
8514300020Production Capacity
30 Sets Per YearKey features
CE and ISO 9001 Certified: Certified by CE and ISO 9001 for quality and safety compliance.
Adjustable Feeding Speed: Feeding speed adjustable from 0.5 to 2 t/h to match production rhythm.
High Mixing Uniformity: Mixing uniformity guaranteed at 95% or higher for stable smelting.
Customizable Voltage: Standard 380V supply with options for high voltage customization.
Dual Control Mode: Supports both automatic and manual control modes for easy operation.
Energy Efficient Design: System power consumption is 5 kW or less for energy saving.
Wide Temperature Adaptability: Operates effectively in temperatures ranging from -10 to 80 degrees Celsius.
Closed Conveying System: Closed belt conveying prevents dust leakage and ensures environmental safety.
Company profile
Business Type: Manufacturer/FactoryAverage Response Time: ≤18h
AI-Powered supplier vetting
SummaryThe supplier demonstrates documented ISO9001:2015 management certification and CE product compliance. It reports production capability of 200 sets across EAF, LF, VOD, VD and SAF processes, but delivery times are lengthy at 4–6 months off-peak and peak, with another record indicating approximately 6 months. Customization is available, including flexible and minor customization. Innovation evidence is weak: no SDK, no new products in the past year, no ODM service, and no well-established OEM service for popular brands, although one national science and technology progress award and three R&D engineers are reported. After-sales and quality systems show procedural gaps, including no written records for complaint handling, supplier-service corrective actions, or service assessments; quality assurance and testing equipment are also absent or insufficiently documented. Financial credibility cannot be established because the records provide only years rather than financial results. No Fortune 500 cooperation,...
Supplier typeThe supplier presents itself as a manufacturing supplier with EAF, LF, VOD, VD and SAF production processes and reported annual output of 200 sets. It primarily exports to Southeast Asia and the Middle East, accepts FOB/CIF/CFR quotations, but has no inventory, overseas warehouse, showroom, branch, or reported overseas-service country coverage.
CertificationsThe supplier reports an ISO9001:2015 management-system certificate and CE certification for products and standards compliance. These are explicit certifications, although no broader certification portfolio is provided.
After-Sales capabilityService procedures exist for supplier-service assessment and corrective/preventive actions, but no records are available, and complaint handling likewise has a procedure without written records. The supplier also reports no overseas agents or branches, no overseas warehouse or showroom, and zero countries with overseas services, limiting demonstrated after-sales reach.
R&D capabilityInnovation capability is constrained by the absence of an SDK, no new products during the past year, no ODM service, and three reported R&D engineers without further performance detail. One national science and technology progress award is reported, but the overall evidence is mixed and insufficient to establish strong current innovation capability.
Production capacityThe supplier reports EAF, LF, VOD, VD and SAF production capacity totaling 200 sets annually. However, stated lead times are 4–6 months in off-peak and peak periods, with another record indicating approximately six months during peak season, showing capacity exists but fulfillment is relatively prolonged.
Customization capabilityThe supplier explicitly offers flexible customization and minor customization. Its quotation terms include FOB, CIF and CFR, indicating support for several delivery arrangements, although the scope and technical depth of customization are not specified.
Client casesThe supplier reports no collaboration with Fortune 500 companies, no offline trade-show participation, and no OEM service for popular brands. Although repeat buyers account for 50%–80% of sales, no named customer cases or independently detailed project references are provided.
Product Q&A
Q:Are you a trading company or a manufacturer?
A:
No, we are manufacturer. We welcome you to visit our own workshop.
Q:What is your delivery time?
A:
For spare parts, the delivery time should be within 90 days. For furnaces, the delivery time should be within 120 days.
Q:Do you have any famous project?
A:
We are the supplier of the largest 350T EAF in Turkey; We are the supplier of a 120t(110000KVA) EAF(CONSTEEL type) in China; We are the supplier of the largest ferrosilicon project (2x36 MVA) in India; We are the supplier of the largest metal silicon EPC project (2x33 MVA) in Sohar, Oman.
Send Inquiry
*To:
Chnzbtech Co., Ltd.
Chnzbtech Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Steel Making Furnace Feeding System for Optimal Performance
US$70,000.00-110,000.00
1 Set(MOQ)
Advanced Feeding and Batching System for Metallurgical Applications
US$70,000.00-110,000.00
1 Set(MOQ)
Advanced Industrial Pipe Annealing System for Optimal Precision
US$11,900.00-26,000.00
1 Set(MOQ)
High-Temperature Cupel System for Optimal Metal Recovery Solutions
US$99,999,998.00-99,999,999.00
99 Pieces(MOQ)
Advanced Stainless Steel Tube Mill Heat Treatment System for Optimal Performance
US$11,900.00-28,800.00
1 Set(MOQ)
Advanced Tube Processing System for Optimal Coil Annealing
US$11,900.00-26,000.00
1 Set(MOQ)
Advanced Electric Induction Cooling System for Optimal Thermal Control
US$20,000.00-1,000,000.00
1 Piece(MOQ)
Advanced Induction Heating Cooling System for Optimal Performance
US$25,000.00-500,000.00
1 Piece(MOQ)
Advanced Feeding System for Efficient Steel Making Furnaces
US$70,000.00-110,000.00
1 Set(MOQ)
Industrial Induction System for Melting
US$100,000.00-180,000.00
1 Piece(MOQ)
Advanced Batching and Feeding System for Steelmaking Furnaces
US$70,000.00-110,000.00
1 Set(MOQ)
Induction Melting Furnace Cooling System for Optimal Performance
US$1,000.00-1,000,000.00
1 Piece(MOQ)
Advanced Quick Tube Heating System for Optimal Annealing
US$14,900.00-29,800.00
1 Set(MOQ)
Electric Inverter System for Optimal Induction Melting and Cooling
US$70,000.00-1,000,000.00
1 Piece(MOQ)
Continuous Annealing System Featuring Pre-Heating for Optimal Results
US$15,000.00-20,000.00
1 Set(MOQ)
Bench-Top Vacuum Melt Spinning System with Optional Power Supply
US$11,000.00
1 Piece(MOQ)
Advanced Vertical Well Vacuum Annealing System for Copper and Aluminum
US$8,880.00-15,500.00
1 Set(MOQ)
Advanced Aluminum Scrap Melting System for Low Oxidation
US$4,500.00
1 Set(MOQ)
TMAXCN Brand-SP-MAM-32 Manual Operated 32-Cavities Arc Melting System in Glove Box for High Throughput Alloy Research
US$7,000.00-20,000.00
1 Piece(MOQ)
Regenerative Combustion System for Aluminum Melting Furnace
US$30,000.00-50,000.00
1 Piece(MOQ)



















