Powered by Made-in-China.com

Power Distribution Switchgear Kyn28A-24 Metal Enclosed Switchgear High Voltage Switch Cabinet
US$2,990.00-4,990.00
1 Piece
Product profile
Customization
AvailableCertification
ISO9001, ISO14001,ISO45001Voltage Level
High VoltageModel NO.
KYN28A-12Installation
RemovableStructure
CabinetCurrent
ACTransport Package
Wooden PackageSpecification
80.00cm * 60.00cm * 220.00cmTrademark
changlidaOrigin
Anhui, ChinaHS Code
8537209000Production Capacity
10000PCS/YearKey features
The safe and dependable 'five-prevention'interlocking system.
Anti-condensation heaters can be fitted in both the circuit-breaker and cable compartments to help prevent condensation and corrosion.
The cubicle enclosure provides an IP4X degree of protection.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2026-05-11Nearest Port: ShanghaiAverage Response Time: ≤2.96hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF
About Our Factory & Business Background
AddressBuilding B2, Phase I, Intelligent Manufacturing Industrial Park, Huagang Town, , Feixi County, Hefei, Anhui, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsOil-Immersed Power Transformer, Dry-Type Power Transformer, High and Low Voltage Switchgear, Box-Type Substation Series, DC Panel, PV Prefabricated Cabins, Ring Main Unit Switchgear
Our Industry Experience & Global Business Record
Main MarketsSouth America, Southeast Asia, Africa, Mid East, Eastern Asia
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product Q&A
Q:Are you a manufacturer ?
A:
Yes, we are manufacturer . We are a professional factory more than 20 years experience in the field of High and Low voltage switchgears,Substation,transformers,cable distribution box and various electrical equipment.
Q:Q:How long is your delivery lead time ?
A:
It depends on your product requirement . Generally ,15-30 working days is available, customized units require 30-45 days.
Q:How do you solve quality problems?
A:
Please porvide detailed photoes of quality problems. Our technical and quality testing department will analyse.
Send Inquiry
*To:
Anhui Changlida Electric Co., Ltd.
Anhui Changlida Electric Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Electric Power Distribution Cabinet Medium Voltage Distribution Panel Mv Hv Switchgear
US$300.00-10,000.00
2 Pieces(MOQ)
Extra High Voltage Smart Grid Armoured Power Distribution Kyn28 Switchgear Cabinet
US$1,200.00-21,000.00
1 Piece(MOQ)
Kyn28A 12 High Voltage Switchgear Empty Sheet Metal Cabinet Shell
US$1,000.00-10,000.00
1 Piece(MOQ)
Kyn28A-24 Mv Medium Voltage Switchgear Power Distribution Cabinet
US$1,000.00-3,000.00
1 Piece(MOQ)
Kyn28-12 Metal-Clad Withdrawable Enclosed Panel High Voltage Electrical Power Cabinet for Mv&Hv Panel
US$1,000.00-10,000.00
1 Set(MOQ)
Gck 380-660V 630-3150A Low Voltage Draw out Switch Cabinet for Mining Power Distribution Cabinet
US$300.00-500.00
1 Piece(MOQ)
Kyn28 Zhejiang Indoor High-Voltage Armored Metal-Enclosed Swithgear Power Grid Distribution High Quality Customized Cabinet Kyn
US$1,000.00-3,000.00
1 Piece(MOQ)
Versatile Transformer Feeder Cabinet with Stable Power Distribution Kyn28A-12 High-Voltage Switchgear
US$999.00-2,999.00
5 Pieces(MOQ)
Cnkeeya Electric Hxgn15-12f (12kV) Enclosed Sf6 Ring Main Unit Switchgear (RMU) /Power Cabinet/Distribution Boards
US$888.00-8,000.00
1 Piece(MOQ)
XCMG Official Gck Power Distribution Low Voltage Withdrawable Switchgear Cabinet for Sale
US$100.00-10,000.00
1 Piece(MOQ)



















