Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2019-03-01Average Response Time: ≤0.14hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, EXW, CIF, DDP, DAP
AI-Powered supplier vetting
SummaryThe supplier offers technical services and sales of various equipment, with a focus on minor customization capabilities and ODM/OEM services for well-known brands. They lack a significant R&D capability, evidenced by the absence of new products and limited design services. Financial data spans 2022-2024 but is not detailed for analysis. They do not provide overseas warehousing or showroom services. After-sales processes exist but lack documentation. Production is centered on transformer testing equipment, with significant export activity. Lead times are consistent, and the proximity to major ports facilitates shipping.
Supplier typeThe supplier operates within technical services, consultation, and sales of various instruments and equipment, including intelligent robots and security equipment.
R&D capabilityThe supplier lacks significant R&D capabilities, shown by no new products and limited design services.
Production capacityThe supplier produces 1000 sets of transformer testing equipment annually and exports a large portion of its products.
Customization capabilityThe supplier offers minor customization and provides ODM and OEM services.
Product Q&A
Q:Can the output current be customized?
A:
Yes, the capacity and maximum current output can be customized according to customer requirements.
Q:What is the warranty period?
A:
The warranty period for all products is one year. Beyond this period, lifetime maintenance is provided with only accessory costs charged.
Q:Do you provide overseas service?
A:
Yes, engineers are available for overseas service to assist with installation and maintenance.
Q:What is the delivery lead time?
A:
The standard delivery lead time is 7 days after the order is confirmed.
Q:How long is the working time for the equipment?
A:
The equipment is designed for a 5-minute short-term work system. For intermittent work, the time should be less than 2.5 minutes, followed by a 10-minute shutdown for cooling.
Send Inquiry
*To:Delta Technology (Chongqing) Co., Ltd.
*Content:
0/4000
Supplier replies will be sent to your registered email