SourcingAI
Try for free
Powered by Made-in-China.com
Glass Bottle Carbonated Drinks Production Line
US$140,000.00-380,000.00
1 Piece

Product profile

Customization

Available

Type

Isobar Filling

Automatic Grade

Fully Automatic

Model NO.

BGF

Material Type

Liquid

Filling Valve Head

Multi-Head

Feed Cylinder Structure

Multi-Room Feeding

Dosing Device

Surface Type

Filling Principle

Pressure

Packaging Container Lifting Structure

Pneumatic Lifting

Structure

Rotary

Packaging

Bottle

Packaging Material

Plastic

Name

Glass Bottle Beer Bottling Plant

Main Material

SUS304/SUS316

Process

Washing, Filing, Capping 3-In1

Application

Water/Beer/Carbonared Drink etc.

Control

PLC Control

Market

Beer Bottling Machine Market

Afters Sale Serveice

Engineers Available to Serivece Overseas

Service

Accept Special Design

Warranty

12 Months

Transport Package

Wooden Case

Specification

CE ISO SGS approved

Trademark

King Machine

Origin

Zhangjiagan City, Jiangsu Province, China

HS Code

84223010

Production Capacity

25 Sets/Months

Key features

Fully Automatic 3-in-1 System: Integrates washing, filling, and capping for carbonated drinks, beer, and water in one unit.
High Production Capacity: Capable of 400 to 25,000 bottles per hour depending on configuration.
Flexible Bottle Compatibility: Handles glass bottles from 200-2000ml with diameters 50-85mm and heights 105-300mm.
Customizable Design: Machines can be designed according to specific material, power, and bottle requirements.
12-Month Quality Warranty: Includes free wearing parts and lifetime technical support after the warranty period.
Overseas Installation Support: Seasoned technicians sent to the factory for installation, debugging, and training.
SUS304/SUS316 Construction: Main materials are high-grade stainless steel ensuring durability and hygiene.
PLC Control System: Advanced PLC control ensures precise filling and automated operation.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 18 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤5.55h

AI-Powered supplier vetting

SummaryThe supplier is a trade company based in Zhangjiagang City, China, specializing in beverage production lines and offering ODM and OEM services. It has a solid after-sales service and quality assurance system, but lacks overseas service capabilities. The company holds a CE certification and operates more than ten production lines with significant annual output.
CertificationsThe supplier holds a CE certification, indicating compliance with EU safety, health, and environmental requirements.
After-Sales capabilityThe supplier provides comprehensive after-sales services, supported by clear procedures for handling customer complaints and a quality assurance system.
Production capacityWith more than ten production lines and an annual output exceeding US$100 million, the supplier shows strong production capabilities.
Customization capabilityThe supplier is capable of providing both ODM and OEM services, indicating a strong customization capability.

Product Q&A

Q:Do you have reference projects?
A:
We have reference projects in most countries. If we get permission from the customer, we can provide their contact information for factory visits. You are also welcome to visit our company to see machines running.
Q:Do you have agents and after-service stations?
A:
We currently have agents in Yemen, Nigeria, Dubai, India, and Kenya. We welcome new partners to join us.
Q:Do you provide customized service?
A:
Yes, we can design machines according to your requirements including material, power, filling type, and bottle types, while offering professional suggestions based on our industry experience.
Q:What is the warranty period for your machines?
A:
We offer a 1-year quality guarantee with free wearing parts and supply life-long technical support.
Q:How long does installation take?
A:
We will send one or two engineers to your plant. The installation and debugging process typically takes about 10 to 25 days.

Send Inquiry

*To:Zhangjiagang King Machine Co., Ltd.Zhangjiagang King Machine Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Glass Bottle Carbonated Soft Drink Production Line
Made-in-China.com
Automatic Glass Bottled Carbonated Drink Production Line
Made-in-China.com