SourcingAI
Try for free
Powered by Made-in-China.com
High Speed Automatic Plastic Cup Lip Curling Machine
US$14,000.00-16,000.00
1 Piece

Product profile

Customization

Available

After-sales Service

All Time

Warranty

One Year

Model NO.

JBJ-120

Certification

ISO

Column number

Four Column

Molding Method

Screw Heating

Automatic Grade

Automatic

Speed

300-400PCS/Min

Diameter

45-120mm

Screw Diameter

1000mm

Screw Material

Copper

Transport Package

Wooden Packaging

Specification

JBJ-120

Trademark

Mingdu

Origin

China

HS Code

84223090

Production Capacity

5sets/Month

Key features

High Speed Production: Output speed reaches 300-400 pieces per minute for efficient manufacturing.
Multi-Material Compatibility: Suitable for processing PP, PVC, PS, and PET plastic cup materials.
Wide Diameter Range: Accommodates plastic cup diameters from 45mm to 120mm.
Advanced Screw Design: Uses three copper screws with 1m length for effective heating and forming.
Automatic Operation: Integrates pneumatic, mechanical, and electrical systems for continuous auto-working.
One Year Warranty: Provides 12-month warranty with free replacement parts for broken components.
ISO Certification: Machine meets ISO certification standards for quality and safety.
Engineer Installation Support: Engineers available for on-site installation and training services.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2016-01-01Nearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤8.76hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF

AI-Powered supplier vetting

SummaryWenzhou Mingdu Machinery Co., Ltd. is identified as a Chinese manufacturer/factory producing plastic forming and thermoforming machinery, including equipment for lids, trays, lunch boxes, medicine trays, and other PP, PS, PET, and PVC products. The supplier reports ISO 9001 certification, 10 production lines, broad export coverage, and export activity since 2016. It provides technical guidance, equipment installation, commissioning, and personnel training. Its stated engineering and quality-control teams each have fewer than five staff, while peak-season fulfillment may require 2–3 months. The available information supports strengths in manufacturing scope, service commitments, certification, and international market experience, but does not sufficiently establish financial strength, innovation performance, customization execution, or specific customer cases.
Supplier typeThe supplier is described as a Manufacturer/Factory and a limited company located in Wenzhou, Zhejiang, China. Its stated business and product keywords focus on plastic forming, thermoforming, tray, lid, and related industrial machinery, although another slice categorizes the company nature as a trade company.
CertificationsThe supplier explicitly reports holding ISO 9001 certification for its management system. This is direct evidence of a documented quality-management certification.
After-Sales capabilityThe supplier states that it provides technical guidance, is responsible for equipment installation and commissioning, and trains technical personnel. These explicit service commitments support after-sales capability, although service coverage, response times, and geographic delivery arrangements are not provided.
Production capacityThe supplier reports 10 production lines, equipment covering several plastic forming applications, and a one-month off-peak lead time. Peak-season order fulfillment is stated as 2–3 months, while the quality-control staff and R&D engineering teams each number fewer than five; these data demonstrate operating capacity but also indicate limited specialist staffing.

Product Q&A

Q:What is the production speed of the machine?
A:
The machine operates at a speed of 300-400 pieces per minute.
Q:Which materials can this machine process?
A:
It is suitable for PP, PVC, PS, and PET plastic cup materials.
Q:What is the warranty period and coverage?
A:
We provide a 12-month warranty. If spare parts break during this period, we send free replacements.
Q:Does the machine support installation and training?
A:
Yes, we can send engineers for installation and training. Buyers must cover visa, tickets, meals, and accommodation costs.
Q:What is the lead time for production?
A:
The lead time is one month during the off-season and 1-3 months during the peak season.

Send Inquiry

*To:Wenzhou Mingdu Machinery Co., Ltd.Wenzhou Mingdu Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

New High Speed Plastic Coffee Cup Vacuum Thermoforming Machine
Made-in-China.com