SourcingAI
Try for free
Powered by Made-in-China.com
Industrial Low Speed Cast Iron Three Phase Y2 AC Asynchronous Electric Induction Motor
US$31.00
50 Pieces
Sample price:US$100.00/piece.Request sample

Product profile

Customization

Available

Application

Industrial, Universal, Household Appliances, Power Tools

Operating Speed

Low Speed

Model NO.

YC63~YC160

Number of Stator

Single-Phase

Species

YC Series Single Phase Motor

Rotor Structure

Squirrel-Cage

Casing Protection

Closed Type

Number of Poles

2,4,6p

Starting Mode

Direct on-line Starting

Certification

ISO9001, CCC, CE

Brand

TZMOTAI

Frequency

50Hz

Insulation

F Class

Protection

IP55

Terminal Box Cover

Plastic or Metal

Efficiency

IE1

Voltage

110V, 220V, 230V, 240V

Mount

B3, B5, B35, B14, B34, V1

Power Range

0.18kw~355kw

Color Painting

as Per Request

Core Wire

Copper Wire

Motor Housing

Cast Iron

Transport Package

Export-Standard Package

Specification

High Torque

Trademark

TZMOTAI

Origin

Taizhou

HS Code

8501400000

Production Capacity

1000PCS/Day

Key features

High Start Torque: Suitable for air compressors, pumps, and equipment requiring high start torque.
Low Noise Operation: Features excellent running performance with low noise levels for smooth operation.
Lightweight Design: Compact shape and light weight make installation and maintenance easy.
Customizable Color: Color painting is available as per customer request.
Wide Voltage Range: Supports 110V, 220V, 230V, and 240V for versatile global application.
Multiple Mounting Options: Available in B3, B5, B35, B14, B34, and V1 mounting configurations.
Lifetime Spare Parts: All spare parts are promised to be available for the lifetime of the motor.
Fast Response Support: Complaints logged within 24 hours with quick competitive offers.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2018-10-24Nearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤2.08hTerms of Payment: LC, T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressNo. 226, Donghe South Road, Zeguo Town, Wenling City, Taizhou, Zhejiang, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsElectric Motors, Water Pump, Blowers, Fans, Aerator, Pressure Switch, Gasoline Engine and Pump, Spare Parts

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period?
A:
We provide a 1-year warranty after receipt of motors.
Q:Is the color customizable?
A:
Yes, color painting is available as per customer request.
Q:What are the available mounting options?
A:
Mounting options include B3, B5, B35, B14, B34, and V1.
Q:What is the lead time for orders?
A:
Peak season lead time is one month, while off-season is within 15 workdays.
Q:Are spare parts available for the long term?
A:
Yes, we promise all spare parts are available for the lifetime use of the motor.

Send Inquiry

*To:TAIZHOU MOTAI ELECTRIC MACHINE CO., LTD.TAIZHOU MOTAI ELECTRIC MACHINE CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like