SourcingAI
Try for free
Powered by Made-in-China.com
Three-Phase Asynchronous Motor For Stone Grinding And Cutting
US$100.00-9,999.00
1 Piece
Sample price:US$100.00/piece.Request sample

Product profile

Customization

Available

Application

Industrial, Power Tools

Operating Speed

High Speed

Model NO.

Three-Phase Asynchronous Motor For Stone Grinding

Number of Stator

Three-Phase

Species

Y, Y2 Series Three-Phase

Rotor Structure

Squirrel-Cage

Casing Protection

Protection Type

Number of Poles

4

Starting Mode

Variable Frequency Starting

Certification

ISO9001, CCC

Brand

TZMOTAI

Frame No.

71-132

Working Way

S1

Insulation Class

F

Protection Level

IP56

Transport Package

Export Standerd Package

Specification

Customizable

Trademark

TZMOTAI

Origin

Taizhou, China

HS Code

8501

Production Capacity

9999PCS/Month

Key features

High Performance Design: Small frame, high power, low vibration, low noise, and smooth operation for stone grinding and cutting.
Robust Protection Level: Cast iron shell with IP56 protection level and F insulation class for durability.
Comprehensive Warranty: 1-year warranty provided after receipt of motors with lifetime spare parts availability.
Fast Response Support: Complaints logged within 24 hours and competitive offers provided within 24 hours.
Customization Options: Customized blowers available including ATEX and belt-driven types for special industries.
Certified Quality: ISO9001 and CCC certified with 100% testing on all products.
Flexible Lead Time: Off-season lead time within 15 workdays; peak season lead time is one month.
Global Shipping Terms: Flexible Incoterms including FOB, CFR, CIF, and EXW from Ningbo or Shanghai ports.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2018-10-24Nearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤2.11hTerms of Payment: LC, T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressNo. 226, Donghe South Road, Zeguo Town, Wenling City, Taizhou, Zhejiang, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsElectric Motors, Water Pump, Blowers, Fans, Aerator, Pressure Switch, Gasoline Engine and Pump, Spare Parts

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period?
A:
We provide a 1-year warranty after receipt of motors.
Q:Are spare parts available for the long term?
A:
Yes, we promise all spare parts are available for lifetime use.
Q:How quickly do you respond to complaints?
A:
We log complaints within 24 hours.
Q:What is the lead time for orders?
A:
Off-season lead time is within 15 workdays, and peak season lead time is one month.
Q:Can you provide customized blowers?
A:
Yes, we offer special customized blowers like ATEX and belt-driven types for industries such as gas transportation and medical.

Send Inquiry

*To:TAIZHOU MOTAI ELECTRIC MACHINE CO., LTD.TAIZHOU MOTAI ELECTRIC MACHINE CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like