SourcingAI
Try for free
Powered by Made-in-China.com
Advanced Cooling Distribution Unit Cdu for High Performance Computing Systems
US$500.00
1-49 Pieces
US$450.00
50-99 Pieces
US$400.00
100+ Pieces
Sample price:US$500.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Online Support

Warranty

1 Year

Model NO.

CDU060

Type

Water-Cooled

Cooling Water

Dry Cooler/Cooling Tower

System Type

Closed System

Fans Species

Double-speed fan

Noise Level

Low

Application Fields

Mining Farms and Data Center

Certification

ISO, CE

Condition

New

Capacity

60 Kw

Power

400/3n/50Hz/60Hz

Product Name

Coolant Distribution Unit Cdu

Material

SS304, SS316L

Heat Exchanger

Within Plate Heat Exchanger

Pump

Variable Frequency Water Pump

Primary Side Medium

Softened Water, Ethylene Glycol Solution

Secondary Side Medium

Deionized Water, Ethylene Glycol Solution and Prop

Transport Package

Export Packaging

Specification

320kg

Trademark

SHENGLIN

Origin

Shanghai, China

HS Code

8415901000

Production Capacity

3000units/Month

Key features

Wide Cooling Capacity Range: Heat transfer capacity ranges from 9 kW to 1500 kW to accommodate diverse operational needs.
High-Efficiency Components: Equipped with variable frequency pumps, plate heat exchangers, and low specific energy consumption fans.
Customizable Fluid Coolers: Fluid coolers can be customized on demand to meet specific project requirements.
Robust Construction: Constructed with SS304 or SS316L materials and features explosion-proof motor options.
Low Noise Operation: Designed with low noise levels ranging from 31 to 69 dB A at 10 meters.
Pre-Installed for Fast Setup: Comprehensive factory pre-installation significantly reduces on-site setup time and delays.
Versatile Application Scenarios: Ideal for large data centers, supercomputing centers, mining farms, and energy storage systems.

Company profile

Shanghai Shenglin M&E Technology Co., Ltd.
Years of Export ExperienceExhibition Experience
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2009-12-29Nearest Port: Shanghai, NingboAverage Response Time: ≤18hTerms of Payment: T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, CFR, CIF, DDP, EXW

AI-Powered supplier vetting

SummaryThe supplier is a limited company with 13 employees, offering HVAC-related products including dry coolers, heat exchangers, condensers, evaporators, chillers, rooftop units, and air handling units. It holds ISO9001:2015 and CE certifications, reports documented inspection and service procedures, and provides overseas debugging, maintenance, repair, training, and installation services. The supplier has exported for 14 years, with exports representing 90% of total sales, and has a one-month average lead time in both peak and off-season periods. It demonstrates customization capability, raw-material traceability, new-product activity, and one R&D engineer, but lacks SDK availability, overseas warehouses, showrooms, agents or branches. No OEM service for popular brands, Fortune 500 cooperation, or customer cases are reported. Financial information is represented only by reference years, so financial credibility cannot be fully assessed.
CertificationsThe supplier reports an ISO9001:2015 management-system certificate and CE certification for product compliance. These certifications provide explicit evidence of quality-system and applicable product-compliance credentials.
After-Sales capabilityThe supplier has documented procedures and records for service-capability assessment, corrective and preventive actions, and customer-complaint handling. It offers overseas debugging, maintenance, repair, training, and equipment installation, with one-month average lead times; however, it has no overseas warehouse, showroom, agent, or branch.
R&D capabilityThe supplier reports launching new products during the past year and has one R&D engineer. However, it does not provide an SDK, so the evidence supports some product-development activity but not broad software-development capability.
Production capacityThe supplier reports finished-product inspection instructions that are uniformly followed, random finished-product inspection, raw-material traceability, and a one-month average lead time in both peak and off-season. Its 13-person workforce and zero stated cooperative suppliers provide limited evidence about production scale, so capability is supported operationally but cannot be assessed as large-scale.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. This directly indicates broad stated customization options.

Product Q&A

Q:Are you a manufacturer or Trade Company?
A:
We are a manufacturing powerhouse capable of fulfilling OEM orders, bringing your vision to life with precision and expertise.
Q:What's the order process?
A:
1) Inquiry-Provide us with all your clear, detailed requirements to start the process. 2) Quotation-Receive an official quotation list, meticulously detailed with all specifications for clarity and transparency. 3) PI-Confirm all technical data and pricing for the order to align expectations and project scopes. 4) Payment Terms-Secure your order with a T/T deposit in advance, ensuring a smooth transaction. 5) Production-Enter mass production with our skilled team ensuring every detail is crafted
Q:How to get a prompt quotation?
A:
When sending your inquiry, please kindly include the following crucial technical information for a swift response. A. Function: Cooling? Confirm the primary function to tailor solutions to your specific needs. B. Capacity: Specify the required capacity in KW or Ton to ensure optimal performance alignment. C. Medium: Indicate the medium used, such as BC-888 or water, to fine-tune our offerings. D. Voltages and Frequency: Specify the required voltage and frequency (V/PH/HZ) to match your operation
Q:What is the warranty period?
A:
We provide a 1-year warranty for our products.
Q:What is the lead time for orders?
A:
The average lead time is one month, regardless of whether it is peak season or off-season.

Send Inquiry

*To:Shanghai Shenglin M&E Technology Co., Ltd.Shanghai Shenglin M&E Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

800kw OEM Coolant Distribution Unit (CDU) for Liquid Cooling
Made-in-China.com
600kw Coolant Distribution Unit (CDU) for Liquid Cooling
Made-in-China.com
1200kw Coolant Distribution Unit for Data Center Cooling
Made-in-China.com
High-Efficiency Coolant Distribution Unit (CDU) for IDC Cooling
Made-in-China.com