SourcingAI
Try for free
Powered by Made-in-China.com
High Cost Performance Air Cooled Heat Exchanger for for Gas Engine
US$6,000.00
1 Piece

Product profile

Customization

Available

Cooling Method

Direct Cooling

Certification

RoHS, ISO, CE

Model NO.

Customized

Condition

New

Transport Package

Wooden Box

Specification

customized

Trademark

Venttech

Origin

Shanghai, China

Key features

Zero Water Consumption: Eco-friendly design eliminates water dependency and wastewater discharge.
Cost-Effective Operation: Lower operational and maintenance costs compared to water-cooled systems.
High Adaptability: Reliable performance in extreme temperatures and harsh industrial environments.
Compact Modular Design: Space-saving structure suitable for various installation constraints.
Long Lifespan: Constructed with corrosion-resistant materials and robust engineering.
Wide Application Range: Ideal for Oil & Gas, Power Generation, Chemical, and Renewable Energy sectors.
Multiple Certification: Complies with RoHS, ISO, and CE standards for global safety and quality.
Flexible Configurations: Options include forced/induced draft, smart controls, and explosion-proof designs.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2009-01-01Nearest Port: SHANGHAI, GUANGZHOU, QINGDAOAverage Response Time: ≤15hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, EXW, Others

AI-Powered supplier vetting

SummaryShanghai Venttech Refrigeration Equipment Co., Ltd. is identified as a Chinese manufacturer/factory specializing in air-conditioning and refrigeration equipment. The supplier reports ISO 9001 certification, six production lines, 6–10 quality-control staff, and 11–20 years of R&D-engineer experience. Its stated capabilities include laboratories, in-house performance testing, a complete quality-testing system, and production of copper-, stainless-steel-, and aluminum-pipe condensers and evaporators. It reports exports to multiple global regions and began exporting in 2009, with export sales accounting for 41%–50% of total sales. Lead time is stated as one month off-season and two to three months during peak season. Evidence of after-sales service, financial credibility, formal customer references, and broader customization processes is limited. No financial figures are provided in this assessment.
Supplier typeThe supplier is explicitly identified as a Manufacturer/Factory and operates in industrial equipment, manufacturing machinery, electrical/electronics, and consumer electronics categories. Its listed products are refrigeration and air-conditioning components and systems, indicating direct manufacturing relevance to the target product area.
CertificationsThe supplier reports ISO 9001 certification and describes a complete quality-testing system, laboratories, professional equipment, and in-house performance testing. These statements support a formal quality-management and testing capability, although no certificate number, validity period, or scope is provided.
R&D capabilityThe supplier reports 11–20 years of R&D-engineer experience, its own laboratories, professional testing equipment, and product features such as precision temperature and humidity control. These are positive indicators of technical development capability, but the slices do not document patents, new-product launches, proprietary technology, or formal R&D outputs.
Production capacityThe supplier reports six production lines, 6–10 quality-control staff, a complete quality-testing system, and product manufacturing across copper, stainless-steel, and aluminum pipe configurations. It states one-month off-peak lead time and two-to-three-month peak-season lead time, indicating established production capacity, though actual capacity volume and utilization are not detailed.

Product Q&A

Q:What are the main applications of this air cooler?
A:
It is widely used in Oil & Gas, Power Generation, Chemical Industry, Renewable Energy, and HVAC & Manufacturing for heat recovery and process cooling.
Q:Does this heat exchanger require water for operation?
A:
No, it is an air-cooled device that eliminates water dependency and produces zero wastewater.
Q:What certifications does the product have?
A:
The product holds RoHS, ISO, and CE certifications.
Q:What are the available lead times?
A:
During peak season, the lead time is 1-3 months; during off-season, it is one month.
Q:What payment terms are accepted?
A:
We accept LC, T/T, PayPal, and Western Union.

Send Inquiry

*To:Shanghai Venttech Refrigeration Equipment Co., Ltd.Shanghai Venttech Refrigeration Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Heat Pipe Exchanger for Factory Fresh Air Energy Saving
Made-in-China.com
High Effecient 220VAC Split Heat Exchanger
Made-in-China.com