SourcingAI
Try for free
Powered by Made-in-China.com
High Efficiency Manual Powder Coating Line for Batch Aluminums Workparts
US$30,000.00
1-4 Sets
US$20,000.00
5+ Sets

Product profile

Customization

Available

Application

Automotive Industry, Furniture Industry, Aluminum Profile

Coating Type

Powder Coating

Model NO.

COLO-Line

Heating system

Diesel, electric, gas, LPG

Warranty

1 Year Warranty

Working Method

Manual Powder Coating

Size

Customizable

Item

Powder Coating Line

Key Word

Manual Powder Coating Line

Transport Package

as Shipping Standard

Specification

Conveyor batch powder coating plant

Trademark

COLO

Origin

China Hangzhou City

HS Code

8424899990

Key features

Customizable Size: The size of the powder coating line is customizable to fit specific production needs.
Multi-Fuel Heating Options: Oven can be heated by electric, gas, diesel, or LPG for flexible energy choices.
High Transfer Efficiency: 100kv manual spray guns deliver high transfer efficiency to save powder costs.
Continuous Production Design: Pass-through spray booth and oven allow continuous coating without manual loading/unloading.
Precise PLC Control: PLC system provides precise heating and easy setting of temperature and time.
1-Year Warranty Coverage: Comprehensive 12-month warranty included for peace of mind and quality assurance.
Energy Efficient Oven: Rockwool insulation and efficient burners reduce heat loss and operating costs.
Expert Custom Design: Over 10 years of engineering experience to design the best line solution for you.

Company profile

Hangzhou Kafan Machinery & Equipment Co.,Ltd.
Importers and ExportersFast DeliveryQuality AssuranceStandardized quality control
Business Type: Manufacturer/FactoryExport Year: 2008-02-01Nearest Port: Ningbo Port/Shanghai PortAverage Response Time: ≤3.04hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, FCA

AI-Powered supplier vetting

SummaryThe supplier specializes in manufacturing and customizing equipment such as spraying and surface treatment machinery, with a focus on customization to meet client requirements. They have a robust OEM capability for popular brands but lack ODM services. Their production facilities include a range of machines and they maintain quality assurance processes. While they do not hold overseas warehouses or participate in trade shows, they have a global reach with exports to several continents. However, there are no written procedures for handling customer complaints or corrective actions, and their R&D is limited with no new products in the past year.
Supplier typeThe supplier is involved in technical services, manufacturing, and sales of equipment, and operates as a combined type company.
After-Sales capabilityThe supplier lacks written procedures or records for after-sales services such as corrective actions and handling customer complaints.
R&D capabilityThe supplier does not offer ODM services or have new products from R&D in the past year, and there is no SDK availability.
Production capacityThe supplier operates two production lines and has a detailed method for inspecting finished products with an annual output of 10,000 pieces of powder coating equipment.
Customization capabilityThe supplier offers a wide range of customization services from samples and designs to full and flexible customization.

Product Q&A

Q:What heating methods are available for the oven?
A:
The powder coating oven can be heated by electric, gas, diesel, or LPG, allowing you to choose the most suitable fuel for your facility.
Q:Is the size of the equipment customizable?
A:
Yes, the size of the powder coating line is customizable to meet your specific production requirements and workspace constraints.
Q:What is the warranty period for this equipment?
A:
We provide a 1-year warranty for all our powder coating line equipment, ensuring quality and reliability.
Q:How does the pass-through design improve efficiency?
A:
The pass-through spray booth and oven allow for continuous coating without the need to manually load and unload workpieces, significantly increasing production efficiency.
Q:What is the lead time for production?
A:
The lead time varies by season: within 15 workdays during the off-season and approximately one month during the peak season.

Send Inquiry

*To:Hangzhou Kafan Machinery & Equipment Co.,Ltd.Hangzhou Kafan Machinery & Equipment Co.,Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Turnkey Manual Powder Coating Line for Big Batch Productions
Made-in-China.com