SourcingAI
Try for free
Powered by Made-in-China.com
Dust-Free Sandblasting Machine Manual Sand Blasting Machine for Metal Parts
US$3,500.00
1-9 Sets
US$2,980.00
10-29 Sets
US$2,580.00
30+ Sets

Product profile

Customization

Available

After-sales Service

1 Year Warranty

Warranty

1 Year

Model NO.

KF-1212W

Drive

Pneumatic

Principle

Press-in

Control

Artificial

Layout

Vertical

Automation

Manual

Kind

Wet Sandblaster

Condition

New

Certification

CE

Customized

Customized

Outer Size

1300*1600*2000mm

Working Area

1200*1200*800mm

Motor

2.2kw

Air Requirement

Flow 0.5-1.1m^3/Min

Lighting

2*18W Saving Lamps

Blasting Gun

1 PC of Wet Blast Gun with 1 Boron Cabide Nozzle

Air Consumption for 1 Gun

0.4-0.8mbar

Volume of Abrasive & Water

25L

Feed Abrasive

4-6kgs

Abrasive : Water

1:3

Voltage

380V/220V 3 Phase (Customized)

Transport Package

Carton/Wooden

Specification

1300*1600*2000mm

Trademark

KAFAN

Origin

China

HS Code

8424300000

Production Capacity

200PCS/Month

Key features

Dust-Free Wet Blasting: Water and abrasive mixture removes rust and contaminants while keeping the chamber dust-free.
Durable Stainless Steel: Constructed with 3mm thick stainless steel and powder-coated surface for rigidity and anti-rust performance.
Abrasive Recycling: Effective abrasive recycling system reduces consumption and requires less maintenance.
Versatile Applications: Ideal for metals, plastics, and rubbers including aviation parts, crank cases, and delicate components.
Customizable Options: Offers full customization, minor customization, and flexible options for size and design.
Safety & Visibility: Features low voltage windscreen wiper, demister, and foot pedal control for safe operation.
CE Certified: Product meets CE certification standards ensuring quality and safety compliance.

Company profile

Importers and ExportersYears of Export ExperienceFlexible CustomizationQuality Assurance
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 16 Years CertifiedNearest Port: Shanghai Port, Ningbo PortAverage Response Time: ≤5.09h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressBuilding 34th, Shunfeng Road No. 536, Tangxi Town, Yuhang District, Hangzhou City, Zhejiang Province, Hangzhou, Zhejiang, China
Plant Area100 square meters
Number of Employees3
Registered Capital500,000 RMB
International Commercial Terms(Incoterms)CIF, CFR, FOB, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Pc
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsSand Blasting Machine, Powder Coating Machine, Powder Coating Equipment, Powder Coating Machine
Production Lines2
Production MachinesWelding Machine, Polishing Machine, Assembling Workbenches, CNC Cutting Machine, Bending Machine, Laser Cutting Machine, Lathe, Milling Machine, Polishing Machine, Welding Machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2009-04-30
Main MarketsEurope, Africa
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is the warranty period?
A:
We provide a 1-year warranty for the machine.
Q:Is the machine customizable?
A:
Yes, we offer full customization, minor customization, and flexible options based on samples or designs.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 piece.
Q:What are the payment terms?
A:
We accept LC, T/T, D/P, Western Union, PayPal, and small-amount payments.
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays during off-season and within one month during peak season.

Send Inquiry

*To:Hangzhou Color Powder Coating Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Fully Automatic Sand Blasting Machine for Alloy Wheels
Made-in-China.com
Dustless Water and Glass Bead Wet Sandblast Machine
Made-in-China.com