Powered by Made-in-China.com
Adjustable Prop Jack Galvanized Prop Shoring Heavy Duty Shuttering Scaffolding Props
US$7.96
1,750 Pieces
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical Support, Onsite Installation, FreWarranty
365daysModel NO.
C093Material
SteelType
MobileStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Single Row ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding PropsConstruction Properties
Building ScaffoldInner Tube
40/48mmOuter Tube
48/56/60mmSurface Finish
Galvanized/Power CoatedThickness
1.6/1.8/2mmPlate
120X120X4mmTransport Package
by Steel PalletsSpecification
48/56MMTrademark
ComacorrdOrigin
ChinaHS Code
73084000Production Capacity
50000piece/YearKey features
Fully Adjustable Design: No working height limit with adjustable lengths ranging from 1.6m to 4.0m.
High Supporting Capacity: Designed for heavy-duty slab formwork support with robust steel construction.
Durable Surface Finish: Available in Hot Dip Galvanized, Electro Galvanized, and Power Coated options.
Easy Installation: Simple to erect and dismantle, saving significant labor and time.
Flexible Usage: No ledger required, allowing flexible erection at any position.
Multiple Tube Sizes: Inner tubes 40/48mm and outer tubes 48/56/60mm to suit various needs.
Quality Certified: Manufactured according to EN-13986:2004 standard with ISO9001 certification.
Comprehensive After-Sales: Includes online technical support and onsite installation services.
Company profile

Business Type: Manufacturer/Factory, Trading Company, Group CorporationExport Year: 2000-01-01Nearest Port: Qingdao, Lianyungang, XingangAverage Response Time: ≤7.00hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
AddressUnit B Rm501, Yuntai International Buildinga, No. 102, Xiangyun 1 Road, Huli,Xiamen, Fujian, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsRinglock Scaffolding, 3ply Panel, Film Faced Plywood, Steel Prop, Formwork Beam, H20 Beam, Concrete Panel, Frame Scaffolding, Shuttering Panel, Doka Panel Similar
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:How about the quality of products in your company?
A:
We have high and best quality products and our products get some good feedbacks from clients all over the world. Once you got our products with some questions under guarantee, we will provide helps at first place. At the usual time, we keep our records about products complaints as low as 1%.
Q:Are you a manufacturer?
A:
Yes , we are a manufacturer, not agent. We have own factory, which is located in TIANJIN,CHINA. We have a leading power in producing and exporting galvanized steel pipe etc. We promise that we are what you are looking for. Welcome to contact us.
Q:What is your MOQ?
A:
Any quantity is acceptable, and when the quantity is less than 5 tons per size, we'll supply from our stock.
Q:Is 3rd inspection on welded steel pipe acceptable?
A:
Yes. are all acceptable.
Q:Do you attend any exhibition?
A:
Yes. We attend exhibition in the South America, Africa, and Southeast Asia every year.
Send Inquiry
*To:
Comaccord (Xiamen) Building Material Co., Ltd.
Comaccord (Xiamen) Building Material Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Scaffold Strut Shoring Construction Adjustable Steel Prop Scaffolding Jack Q235/Q345 Formwork Props Scaffold
US$9.00-15.00
5,000 Pieces(MOQ)
Prop Heavy Duty Adjustable Steel Scaffolding Steel Base Jack Screw Jack
US$5.00-30.00
500 Pieces(MOQ)
Heavy Duty Metal Props Scaffolding Shoring Adjustable Steel Prop Support
US$14.00-20.00
3,000 Pieces(MOQ)
Galvanized Adjustable Steel Telescopic Shoring Prop for Formwork and Scaffolding
US$6.00-19.60
500 Pieces(MOQ)
Construction Building Material Galvanized Acro Jack Formwork Shoring Steel Prop
US$5.00-12.50
300 Pieces(MOQ)
Comaccord Heavy Duty Steel Adjustable Props
US$8.90-9.20
1,750 Pieces(MOQ)
Adjustable Galvanized Steel Props Scaffolding Steel Shoring Prop
US$9.05-14.20
500 Pieces(MOQ)
Galvanized Formwork Jack Scaffolding Adjustable Steel Push Pull Prop
US$6.00-11.00
500 Pieces(MOQ)
Galvanized Adjustable Jack Steel Shoring Post Heavy Duty Metal Construction Steel Prop
US$5.00-12.50
300 Pieces(MOQ)
Building Materials Formwork Scaffolding Adjustable Support Steel Shoring Push Pull Prop Jack Post
US$8.00-12.00
200 Pieces(MOQ)
Q235B Adjustable Scaffolding Prop Shoring Jack Steel Formwork Acrow Steel Prop
US$6.00-7.00
500 Pieces(MOQ)
Scaffolding Construction Adjustable Props Steel Shoring Jack Post Best Price
US$8.20-10.20
1,000 Pieces(MOQ)
Best Price Steel Construction Jack Push Pull Used Shoring Doka Adjustable Acrow Prop
Negotiable
100 Pieces(MOQ)
Q235 Powder Coated Spanish Type Steel Prop 2.0-3.5m Adjustable Shoring Jack Prop
US$6.00-11.10
50 Pieces(MOQ)



















