SourcingAI
Try for free
Powered by Made-in-China.com
Comaccord Construction Formwork Coated Scaffold Scaffolding Powder Steel System Prop
US$12.85
1-4 20GP
US$12.00
5-9 20GP
US$8.00
10+ 20GP

Product profile

Customization

Available

Material

Steel

Type

Mobile

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Single Row Scaffolding

Erection Position

Internal Scaffolding

Move Method

Horizontal mobile Scaffolding

Scaffolding Part Type

Scaffolding Props

Construction Properties

Building Scaffold

Plate Size

150mm*150mm*4mm

Surface Finish

Galvanised, Painted

Outer Tube

60mm,56mm,48mm

Inner Tube

40mm,48mm

Lock Pin

G Type or Line Pin

Certificate

SGS

Transport Package

Steel Pallet

Specification

3mm

Trademark

Comacorrd

Origin

China

HS Code

73084000

Production Capacity

50000piece/Year

Key features

High Load Capacity: Designed for slab formwork and table formwork with maximum stability for site jobs.
Wide Adjustable Range: Heavy duty 1800-5000mm and light duty 1600-3500mm options available.
Customizable Surface: Options include galvanised, painted, hot dipped, pre-galvanized, and electrical galvanized.
OEM Service Available: Customized plate size, tube dimensions, and lock pins supported.
SGS Certified: Products meet SGS certification standards for quality assurance.
Versatile Base Plate: Available in flower or square shapes with various thicknesses.
Flexible Tube Sizes: Inner tubes 40mm/48mm and outer tubes 48mm/56mm/60mm.
Multiple Package Options: Can be packed in bundles or shipped in bulk for logistics flexibility.

Company profile

Business Type: Manufacturer/Factory, Trading Company, Group CorporationExport Year: 2000-01-01Nearest Port: Qingdao, Lianyungang, XingangAverage Response Time: ≤6.92hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressUnit B Rm501, Yuntai International Buildinga, No. 102, Xiangyun 1 Road, Huli,Xiamen, Fujian, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsRinglock Scaffolding, 3ply Panel, Film Faced Plywood, Steel Prop, Formwork Beam, H20 Beam, Concrete Panel, Frame Scaffolding, Shuttering Panel, Doka Panel Similar

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What are the adjustable length ranges?
A:
Heavy duty props range from 1800mm to 5000mm, while light duty props range from 1600mm to 3500mm.
Q:What surface finishes are available?
A:
Options include paint, hot dipped galvanized, pre-galvanized, and electrical galvanized.
Q:Is OEM service supported?
A:
Yes, OEM service is available for customized plate sizes, tube dimensions, and lock pins.
Q:What are the payment terms?
A:
Payment terms include LC (Letter of Credit) and T/T (Telegraphic Transfer).
Q:What is the average lead time?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.

Send Inquiry

*To:Comaccord (Xiamen) Building Material Co., Ltd.Comaccord (Xiamen) Building Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like