SourcingAI
Try for free
Powered by Made-in-China.com
Energy-Efficient Stainless Steel Closed Loop Cooling Tower for Petrochemical Industry
US$2,000.00-100,000.00
1 Piece

Product profile

Customization

Available

After-sales Service

Lifetime Tech Support & After-Sales Guarantee

Warranty

12 Months

Model NO.

KCH

Cooling Method

Parallel Flow

Ventilation Mode

Mechanical Ventilation

Material

Metal

Air Contact Form

Dry

Air Contact Way

Closed

Tower Shape

Square

Noise Level

Low

Application Fields

Industrial

Certification

RoHS, UR, ISO, CE, CCC, SGS

Condition

New

Transport Package

Container

Specification

100-3000KW

Trademark

CRONX

Origin

China

HS Code

8419899090

Production Capacity

200sets/Month

Key features

Parallel Air-Water Flow for Superior Heat Exchange Performance
High-Efficiency Coil Heat Exchanger
Fill Design Minimizes Coil Usage And Reduces Cost
Spacious Maintenance Access

Company profile

Shandong Casen Heat Transfer Technology Co., Ltd. Qingdao Branch
Experienced TeamCooperated with Fortune 500Importers and ExportersPatents Awarded
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.44h

About Our Factory & Business Background

AddressUnit 2706, Building B2, No. 8 Hong Kong Middle Road, Shinan District, Qingdao, Shandong, China
Plant Area16000 square meters
Number of Employees74
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 set
Supply Chain Partners600

Our Production Capability & Technical Expertise

Main ProductsClosed Circuit Cooling Tower, Evaporative Condenser, Integrated Heat Exchange Station, Compound Flow Cooler, Indirect Evaporative Condenser, Adiabatic Efficient Air Cooler, Air Cooler
Production Lines1
Production MachinesBending Machine, Forming Machine, Laser Cutting Machine, Pipe Bending Machine, Pipe Making Machine, Sawing Machine, Ultrasonic Flaw Detector, Work Vibration Meter, Airflow Tester
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers7 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2026-01-12
Main MarketsNorth America, Europe, Domestic
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Cooperated with Fortune 500Yes

Product Q&A

Q:Are you a manufacturer or a trading company?
A:
We are a genuine manufacturer - Shandong Cronx Heat Transfer Technology Co., Ltd., specializing in the R&D, design, and production of cooling equipment such as cooling tower,evaporative condenser and air coolers. The company has a complete technical team, production workshop, and quality inspection process. All products are manufactured in-house, providing you with direct technical support and after-sales service, eliminating intermediary markups.
Q:How do you guarantee product quality?
A:
We ensure quality through full-process control: Design: Customized designs by experienced engineers based on your operating parameters. Production: Supervisor oversight with photos of key milestones (e.g., fan and motor nameplates). Pre-shipment: Progress photos provided before final payment; third-party or on-site inspection available per contract. After-sales: Key component info (fan, pump, motor) archived for easy maintenance.
Q:What is the delivery time?
A:
Delivery time for standard and custom equipment is usually 30-45 days, depending on type, complexity, and order schedule. After receiving confirmed design and 30% deposit, we arrange production. About 15 days before shipment, we report progress and coordinate final payment. For urgent projects, please specify when ordering; we will do our best to adjust the schedule.

Send Inquiry

*To:Shandong Casen Heat Transfer Technology Co., Ltd. Qingdao BranchShandong Casen Heat Transfer Technology Co., Ltd. Qingdao Branch
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like