SourcingAI
Try for free
Powered by Made-in-China.com
40FT LNG Container - Crrc Tank Container for Safe Storage Solutions
US$30,000.00-100,000.00
1 Piece
Sample price:US$60000.00/piece.Request sample

Product profile

Customization

Available

Capacity

40 feet (45,000-70,000 liters)

Certification

ISO Tank

Model NO.

20ft/40ft

Insulation Type

Vacuum Insulation

Lining Material

Container

Material

Stainless Steel

Type

Standard Tank Container

Valve Type

Ball Valve

Transport Package

40FT LNG Tank Container Unpacked

Specification

40ft

Trademark

CRRC

Origin

China

HS Code

8609002200

Production Capacity

10000PCS/Year

Key features

Weather-Resistant Steel Body: Integrally welded high-strength steel with light tare weight for durability.
Large Load Capacity: Designed for ample volume transport of coal, ore, and bulk materials.
Flexible Loading Options: Supports both manual and mechanical loading and unloading operations.
24-Hour Technical Response: Business team responds within 24 hours to arrange professional support.
2-Year Comprehensive Warranty: Covers manufacturing defects and material issues for 24 months from delivery.
Customized Solutions Available: Offers customization for track gauges, axle loads, and specific requirements.
ISO9001 Certified Quality: Manufactured under strict ISO9001:2015 and ISO45001:2018 management systems.
Multimodal Transport Support: Flexible shipping via railway, road, or bulk vessel to port or site.

Company profile

CRRC Yangtze Co., Ltd
Importers and ExportersHigh Repeat Buyers ChoiceYears of Export ExperienceExperienced Team
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 20 Years CertifiedNearest Port: Wuhan PortAverage Response Time: ≤3.82h

About Our Factory & Business Background

AddressDaqiao New Area, Jiangxia Economic Development Zone, Wuhan, Hubei, P.R.China
Plant Area998500 square meters
Number of Employees2474
Registered Capital143,830,108,176 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners3250

Our Production Capability & Technical Expertise

Main ProductsReefer Container, Freight Wagon Part, Refrigerated Container, Freight Wagon Air Brake System, Freight Wagon Axle, Bogie, Tank Container, LNG Container, Freight Wagon Wheel Set, Railway Freight Wagon
Production Lines12
Production MachinesLaser Cutting Facility, Pressing Facility
QA/QC inspectors120 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers325 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2006-09-14
Main MarketsSoutheast Asia/ Mideast, Domestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No

Product Q&A

Q:What is the holding time for LNG in this container?
A:
The holding time of LNG under standard test environment reaches 103 days.
Q:What monitoring systems are included?
A:
It is equipped with an intelligent informatized remote monitoring system, as well as GPS and Beidou systems, to monitor pressure, liquid level, temperature, and location.
Q:Is customization available for this product?
A:
Yes, customization options include customization from samples, designs, full customization, minor customization, and flexible customization.
Q:What are the payment terms?
A:
We generally accept T/T (Telegraphic Transfer) or L/C (Letter of Credit) at sight. Specific terms can be discussed based on the order volume and cooperation history.
Q:What is the production lead time?
A:
The lead time is 1-3 months for both peak and off-seasons, subject to order quantity and technical complexity.

Send Inquiry

*To:CRRC Yangtze Co., LtdCRRC Yangtze Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Cost-Effective High Pressure Tank Container for LNG Delivery
Made-in-China.com