CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from DesignsExport Year: 2005-05-05Nearest Port: Shanghai or Shenzhen, Ningbo or NantongAverage Response Time: ≤0.01h
AI-Powered supplier vetting
SummaryThe supplier is a combined enterprise with over ten years of experience in hydraulic static pile drivers. They possess quality assurance in their processes and offer customization services. However, they lack valid contracts with factories, overseas warehousing, and showroom capabilities. Their financial data is up-to-date, and they carry ISO and CE certifications. Although they have no SDK for R&D, they provide ODM and OEM services and have introduced new products recently.
Supplier typeThe supplier is a combined entity with significant experience in hydraulic static pile drivers. They have evolved into a restructuring state-owned enterprise.
CertificationsThe supplier holds ISO9001:2015, ISO14001, and ISO45001:2018 certifications, along with CE product certifications.
R&D capabilityThey have introduced new products in the past year and offer ODM services, despite the absence of SDK availability.
Customization capabilityThe supplier offers customization services based on designs, supporting a tailored approach to their products.
Product Q&A
Q:Are you a manufacturer or a trading company? What kind of machine do you produce?
A:
We are a pioneering manufacturer with over 20 years of experience in producing a diverse range of piling machinery. Located in Changsha, Hunan, China, our flagship products include hydraulic static pile drivers, bored pile drilling rigs, hydraulic hammers, disc pelletizers, and mini crawler dumper trucks, among others.
Q:What does the hydraulic static pile driver used for?
A:
Our hydraulic static pile driver is expertly designed for jacking in precast concrete piles of various shapes, including square, round, triangle, tubes, and H-piles. It operates with zero noise, pollution, or vibration, offering a serene and eco-friendly piling solution.
Q:How about the lead time and payment terms?
A:
Our standard lead time is typically 30 days post-receipt of deposit, barring any special requirements. We accept both T/T and L/C payment terms, providing flexibility to our valued clients.
Q:How about after sale service and warranty of machine?
A:
We offer comprehensive after-sale service including expert assembly and operator training. Enjoy peace of mind with a 1-year warranty on machine structure and 6 months on main spare parts, complemented by lifelong after-sale service.