SourcingAI
Try for free
Powered by Made-in-China.com
Lab Compact Planetary Ball Mill for Grinding Various Metal Materials
US$3,900.00-6,900.00
1 Piece

Product profile

Customization

Available

Additional Capabilities

Milling

Application

Granules, Powder

Model NO.

CY-MSK-SFM-1S

Application Area

Metallurgy&Mineral

Certification

CE

Condition

New

Mixing Drum Shape

Ball Mill Jar

Stirring Type

Planetary Ball Mill

Warranty

One Year

Working

High Speed Mixer

Max. Power Consumption

550W

Noise Level

55~70 Decibel

Net Weight

70kg

Mixer Type

Planetary Mixer

Layout Type

Horizontal

Operating Type

Continuous Operating

Transport Package

Wooden Case

Specification

661mm(L) x 417.5mm(W) x 396mm(H)

Trademark

CYKY

Origin

Zhengzhou, China

Production Capacity

100pieces/Month

Key features

4 Grinding Stations: Process up to 4 different materials simultaneously with 100ml SS milling jars.
High Precision Grinding: Minimum output granularity as small as 0.1 um depending on material properties.
Touch Screen Control: Digital display allows easy programming for speed, direction, timing, and 10 stored recipes.
Wide Application Range: Suitable for Geology, Mining, Metallurgy, Ceramics, Chemical Engineering, and Medicine.
Adjustable Speed Ratio: Revolution 0-400 RPM and self-rotation 0-800 RPM with a 1:2 speed ratio.
Comprehensive Warranty: One-year limited warranty with lifetime technical support for mechanical defects.
Customization Available: Customized instruments available with a lead time of 30-60 days based on specifications.
Low Noise Operation: Operating noise level ranges from 55 to 70 decibels for a quiet environment.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2012-09-04 CertifiedNearest Port: QingdaoAverage Response Time: ≤6.11h CertifiedTerms of Payment: LC, T/T, D/P, etc.

AI-Powered supplier vetting

SummaryZhengzhou CY Scientific Instrument Co., Ltd. is a China-based limited company established in 2013 and identified as a factory. It develops and manufactures scientific and advanced-materials equipment, including CVD systems, tube furnaces, muffle furnaces, dental furnaces, and plasma cleaners. The supplier reports more than 10 production lines, a 565.6 m² manufacturing plant, 6–10 quality-control staff, and order fulfillment within 15 workdays in both peak and off-peak periods. Its export sales share is reported at 71%–90%, with markets spanning multiple regions. The company describes research and development activity and technical accumulation, but only three R&D engineers are reported. No supplier management-system certification is listed. Trade evidence shows one transaction associated with each of three records involving the same Kazakhstan buyer, which provides limited customer-case evidence. After-sales and customization capabilities are not explicitly documented.
Supplier typeThe supplier is identified as a factory and a limited company based in Zhengzhou, China, with manufacturing activity, a stated production site, and products including furnaces, CVD systems, and plasma cleaners. Its description presents an integrated R&D, manufacturing, and management operation focused on scientific and advanced-materials equipment.
CertificationsThe supplier’s certification of management systems is explicitly recorded as “NIL.” This indicates no management-system certification is evidenced in the provided information.
R&D capabilityThe company explicitly describes itself as a scientific and technological innovation enterprise engaged in research, development, new-product development, and technical accumulation in thermal engineering and advanced-materials preparation equipment. The reported total R&D-engineer experience is 3, which supports the existence of R&D activity but does not demonstrate extensive R&D depth.
Production capacityThe supplier reports more than 10 production lines, a 565.6 m² manufacturing plant, 6–10 quality-control staff, 18 total employees, and order fulfillment within 15 workdays in both peak and off-peak seasons. These figures provide explicit evidence of operating production capacity and relatively consistent stated lead times.

Product Q&A

Q:Are you a manufacturer or a trading company?
A:
We are professional laboratory instrument manufacturers with our own design team and factory, ensuring product quality and optimal pricing.
Q:What is the after-sales service system like?
A:
The product warranty period is 12 months with lifetime maintenance. Professional pre-sales and after-sales departments respond within 24 hours to resolve technical issues.
Q:How long is the delivery time for customized instruments?
A:
If goods are in stock, delivery takes 5-10 days. For customized instruments, it usually takes 30-60 days depending on specifications.
Q:How do you handle different power supply and plug requirements?
A:
We can supply a transformer and plug according to your local requirements based on the power plug of different countries.
Q:What payment methods do you accept?
A:
We accept T/T, L/C, D/P, etc., and it is recommended to use Trade Guarantee.

Send Inquiry

*To:Zhengzhou CY Scientific Instrument Co., Ltd.Zhengzhou CY Scientific Instrument Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like