Powered by Made-in-China.com

Laboratory 1200 Two Heating Zone CVD Equipment for Thin Film Preparation
US$2,000.00-20,000.00
1 Piece
Product profile
Customization
AvailableApplication
School, LabCustomized
CustomizedModel NO.
CY- O1200-50IIT-3Z-LVCertification
CEStructure
DesktopMaterial
Stainless SteelType
Tubular FurnaceVacuum Tube Furnace
High Purity QuartzTube Diameter
50mmTube Length
1000mmHeating Zone Length
200+200mmOperating Temperature
0-1100cGas Supply System
Gas Mass FlowmeterMeasurement Accuracy
+-0.2%Ultimate Vacuum
1.0e-1PARotary Vane Pump
1.1L/STransport Package
Standard Export Fumigation Sign Wooden Box PackagiSpecification
Vacuum quartz tubeTrademark
CYKYOrigin
Zhengzhou Henan ChinaKey features
Dual Independent Heating Zones: Two zones with independent temperature control for creating gradients or constant temperature areas.
Customizable Gas Channels: Standard 3-channel mass flow meter with option to customize channel count and gas types.
Flexible Tube Diameter Options: Standard 50mm diameter with optional 60mm, 80mm, and 100mm sizes available.
High Purity Quartz Construction: Tube furnace made of high purity quartz for superior chemical resistance and thermal stability.
Advanced Vacuum System: Double stage rotary vane pump achieving ultimate vacuum of 1.0E-1Pa with digital monitoring.
User-Friendly Touch Interface: High-definition true color touch screen allows non-professionals to master operation quickly.
Comprehensive Warranty Coverage: 12-month warranty period with lifetime maintenance support and 24-hour technical response.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2012-09-04 CertifiedNearest Port: QingdaoAverage Response Time: ≤5.93h CertifiedTerms of Payment: LC, T/T, D/P, etc.
AI-Powered supplier vetting
SummaryZhengzhou CY Scientific Instrument Co., Ltd. is a China-based limited company established in 2013 and identified as a factory. It develops and manufactures scientific and advanced-materials equipment, including CVD systems, tube furnaces, muffle furnaces, dental furnaces, and plasma cleaners. The supplier reports more than 10 production lines, a 565.6 m² manufacturing plant, 6–10 quality-control staff, and order fulfillment within 15 workdays in both peak and off-peak periods. Its export sales share is reported at 71%–90%, with markets spanning multiple regions. The company describes research and development activity and technical accumulation, but only three R&D engineers are reported. No supplier management-system certification is listed. Trade evidence shows one transaction associated with each of three records involving the same Kazakhstan buyer, which provides limited customer-case evidence. After-sales and customization capabilities are not explicitly documented.
Supplier typeThe supplier is identified as a factory and a limited company based in Zhengzhou, China, with manufacturing activity, a stated production site, and products including furnaces, CVD systems, and plasma cleaners. Its description presents an integrated R&D, manufacturing, and management operation focused on scientific and advanced-materials equipment.
CertificationsThe supplier’s certification of management systems is explicitly recorded as “NIL.” This indicates no management-system certification is evidenced in the provided information.
R&D capabilityThe company explicitly describes itself as a scientific and technological innovation enterprise engaged in research, development, new-product development, and technical accumulation in thermal engineering and advanced-materials preparation equipment. The reported total R&D-engineer experience is 3, which supports the existence of R&D activity but does not demonstrate extensive R&D depth.
Production capacityThe supplier reports more than 10 production lines, a 565.6 m² manufacturing plant, 6–10 quality-control staff, 18 total employees, and order fulfillment within 15 workdays in both peak and off-peak seasons. These figures provide explicit evidence of operating production capacity and relatively consistent stated lead times.
Product Q&A
Q:Are you a manufacturer or a trading company?
A:
We are professional laboratory instrument manufacturers, have their own design team and factory, have mature technical experience, and can guarantee the quality of products and the optimal price.
Q:How is your company's product after-sales service system?
A:
The product warranty period is 12 months, we can provide lifetime maintenance. We have professional pre-sales and after-sales departments that can respond to you within 24 hours to resolve any technical issues.
Q:How long is your delivery time? If I want to customize the instrument, how long does it take?
A:
1. If the goods are in stock, it is 5-10 days. 2. We can provide customized services for our customers. It usually takes 30-60 days depending on the specifications of the custom instrument.
Q:Our country's power supply and plug are different. How do you solve it?
A:
We can supply a transformer and plug according to your local requirements according to the power plug of different countries.
Q:How to pay?
A:
T / T, L / C, D / P, etc., it is recommended to use Alibaba Trade Guarantee.
Send Inquiry
*To:
Zhengzhou CY Scientific Instrument Co., Ltd.
Zhengzhou CY Scientific Instrument Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Laboratory Low Vacuum CVD Equipment with Double Heating Zone for CVD Experiment
US$2,000.00-20,000.00
1 Piece(MOQ)
1200c Two Heating Zone Low Vacuum CVD Equipment for CVD Experiments in a Variety
US$2,000.00-20,000.00
1 Piece(MOQ)
Laboratory Electric Heating and Meaurement Equipment for Film Casting Machine
US$10.00
1 Piece(MOQ)
Two Heating Zone High Vacuum CVD Coating Equipment
US$2,000.00-20,000.00
1 Piece(MOQ)
1200c  Two Zone Low Vacuum CVD Equipment for CVD Experiment
US$2,000.00-20,000.00
1 Piece(MOQ)
5L Fractional Distillation Equipment Rotavapor Distilling Equipment for Lab
US$1,350.00-1,550.00
1 Set(MOQ)
Gltlab Laboratory Heating Equipment with Ceramic Coated Aluminum
US$90.00-129.00
50 Pieces(MOQ)
Hot Plate Low Price Mini Glass Top Magnetic Stirer Laboratory Heating Equipment
US$198.82-248.53
1 Set(MOQ)
SCITEK Multi-Row Electronic Control Heating Mantle Heating Laboratory Equipment
US$19.00-320.00
1 unit(MOQ)
High-Performance 10L Essential Oil Distillation Equipment for Labs
US$1,600.00-1,800.00
1 Set(MOQ)
SCITEK Electronic Digital Heating Mantle Laboratory Heating Equipment
US$9.00-290.00
1 unit(MOQ)
1200c Two Heating Zone Low Vacuum CVD Tube Furnace Equipment
US$9,000.00-18,800.00
1 Piece(MOQ)
Large 50L Industrial Evaporation Equipment for Salt
US$3,200.00-3,500.00
1 Set(MOQ)
Vacuum CVD Experimental Equipment for Quality Inspection of Industrial
US$16,000.00-20,000.00
1 Piece(MOQ)
Laboratory Bunsen Burner Chemical Experimental Equipment Portable Bunsen Burner for Lab Use
US$4.80-7.00
10 Pieces(MOQ)
Lab Instrument Equipment Digester 360° Surround Heating for Sample
US$13,362.00
1 Set(MOQ)
SCITEK Electronic Magnetic Stirring Heating Mantle Constant Temperature Heating Equipment
US$30.00-105.00
1 unit(MOQ)
Ultra Clean Laboratory Heating Equipment Ud3040 for Sample Treatment Tasks
US$6,875.00
1 Set(MOQ)
Laboratory Water Distillation Equipment for Evaporation
US$666.00-755.00
1 set(MOQ)



















