Powered by Made-in-China.com
Galvanized H Beam Steel Structure Building Material Project H Beam
US$380.00-458.00
1 Ton
Sample price:US$458.00/ton.Request sample
Product profile
After-sales Service
SupportWarranty
2 YearsAdditional Service
Cutting, DrillingModel NO.
Q235bProduct Name
C Channel PurlinAfter-Sale Service
Solve Any Problems for ClientsCompany Years
12 YearsShipping Service
Cheaper and RealiableDelivery Time
7 DaysQuality Control
as RequestPlace of Origin
Shanghai, ChinaMOQ
1tonPackage
Standard Seaworth PackingUsage
Construction StructurePayment Term
30%Tt Advance + 70% BalanceTransport Package
1. Big Od/ Bulk Small Od: Packed by Steel StripSpecification
GB, ASTM, AISITrademark
CZOrigin
ShanghaiKey features
Wide Application Range: Used in industrial/civil buildings, bridges, shipbuilding, and underground engineering.
Cost & Material Saving: Reduces steel consumption by 15%-20% compared to conventional hot rolled I-steel.
2 Years Warranty: Comprehensive 2-year warranty coverage for mechanical defects and quality assurance.
Custom Manufacturing: Supports production based on customer drawings or specific design requirements.
Flexible Payment Terms: Accepts TT (30% deposit, 70% balance) and L/C for secure transactions.
Professional Installation Support: Provides installation instructions, videos, and on-site technician assistance if needed.
Fast Delivery: Delivery within 3-15 working days after deposit or L/C receipt.
Standard Seaworthy Packing: Bulk or steel strip packing suitable for 20ft/40ft containers with high load capacity.
Company profile
Business Type: Manufacturer/Factory CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤2.32h CertifiedTerms of Payment: LC, T/T, PayPal
About Our Factory & Business Background
AddressMeilan Lake, Baoshan District, Shanghai, China
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Ton
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Structure, Square Tube, Galvanized Steel Sheet Coil, Cold Rolled Steel Sheet Coil, Stainless Steel Sheet, Steel Channel, Steel H Beam, Angle Steel, Seamless Pipe, Round Tube
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Function inspection & Visual inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Main MarketsSouth America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea)
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Product Q&A
Q:How long is your delivery time?
A:
Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q:Do you provide samples? is it free or extra?
A:
Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q:What is your MOQ?
A:
Usually our MOQ is 5t. But if your quantity is small, the price may be a little higher. When there is a big quantity, the price will be quite lower.
Q:How to buy your ideal products?
A:
You can provide us your drawing, and we will produce as your drawing. Or we can design as your requirements if you do not have a clear plan.
Q:How to pay?
A:
TT and L/C are acceptable and TT will be more appreciated.30% deposit before producing, 70% balance before loading by TT.
Send Inquiry
*To:
Shanghai Changzeng Metal Co., Ltd.
Shanghai Changzeng Metal Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Prefabricated Carbon Q235/Q355 Steel Frame H Beam for Steel Structure Building
US$800.00-850.00
50 Tons(MOQ)
Galvanized Welded H Beam for Steel Structure Building From China Factory
US$600.00-900.00
50 Tons(MOQ)
Large Span Steel Structure Warehouse Building with Bolted Connection System and H Beams
US$28.60-65.50
300 Pieces(MOQ)
SGS Approved H Beam for Steel Structure Building/H Steel Building Material
US$600.00-900.00
50 Tons(MOQ)
Welded H Beam Steel Structure Frame for Pre Engineered Building
US$546.00
200 Tons(MOQ)
Galvanized H Beam Welded Steel Material H Beam for Steel Structure Factory Building
US$600.00-900.00
50 Tons(MOQ)
China Mill H Beam Steel Structure Material Hot Rolled 6m 12m Length
US$546.00
200 Tons(MOQ)
W10/W12/W14 Flange American Standard H Steel Beam for Prefabricated Structure Building
US$568.00-650.00
5 Tons(MOQ)
ASTM Building Material H Beam Steel Profiles Factory Customized Various Specification H-Beam
US$380.00-458.00
1 Ton(MOQ)
High Quality Steel Column and Beam for Steel Structure Building Material
US$820.00-840.00
100 Tons(MOQ)
Steel Structure H Beam, Hot Rolled and Customized 12m Length Galvanized Steel H Beam
US$380.00-458.00
1 Ton(MOQ)
High Strength H-Section Steel Structure H Beam for New Zealand Projects
US$20.00-30.00
500 Square Meters(MOQ)
China High Quality Steel Structure Building Frame Material Steel Beam
US$800.00-820.00
1,000 Tons(MOQ)
Q235 Hot DIP Galvanized Structure H Beam Carbon Steel H Beam Price Customized Structural Steel I Beam
US$480.00-550.00
100 Tons(MOQ)
Prefabricated Hot DIP Galvanize 125X125 Carbon Steel Roof Support H-Beam for Building
US$380.00-458.00
1 Ton(MOQ)
GB Standard Prefab Steel Structure Building Prefab House Material Steel Column and Beam
US$800.00-820.00
1,000 Tons(MOQ)
Low MOQ Best Quality Steel Structure Heavy Duty H Beam for Building
US$380.00-458.00
1 Ton(MOQ)
High Performance H Section Steel Beam European Standard for Steel Structure Building Work
US$568.00-650.00
5 Tons(MOQ)
Structural H Beam Steel for Warehouse Building Q355 Q235
US$560.00-580.00
25 Tons(MOQ)
High Durable European Standard H Beam Steel for Steel Structure Building Construction
US$568.00-650.00
5 Tons(MOQ)



















