Trenchless Construction Technology: Enables underground pipe laying without excavation surface, avoiding disruption to traffic and buildings.
High Precision Deviation Control: Adjustment angle for upper, lower, left, and right deviation reaches up to 5.5 degrees.
Fast Jacking Speed: Maximum jacking speed can reach 200mm per minute for efficient project completion.
Versatile Soil Adaptability: Suitable for soft soil, clay, sand, gravel, hard soil, and backfill soil conditions.
Independent Grouting System: Features independent water injection and grouting systems for soil stability.
Centralized Control System: Surface centralized control ensures safe, intuitive, and convenient operation.
Comprehensive After-Sales Support: Includes overseas commissioning engineers, 12-month warranty, and lifetime service support.