SourcingAI
Try for free
Powered by Made-in-China.com
High Performance Self-Healing Capacitor for Reliable Power Solutions
US$1.00-1.20
200 Pieces
Sample price:US$0.50/piece.Request sample

Product profile

Customization

Available

Type

Polypropylene Capacitor

Application

AC / Motor, Air Conditioner

Model NO.

CBB60

Packaging Type

Through Hole

Capacitance

1-100UF

Structure

Fixed Capacitor

Manufacturing Material

Polypropylene

Electrolyte

Film Capacitors

Usage

Low Frequency Coupling

Tuning

Polystyrene Capacitor

Filter

Aluminum Electrolytic Capacitor

Product Name

AC Motor Run Capacitor for Air Conditioner

Applications

Air Conditioner/Compressor/Dryer

MOQ

200PCS

Size

1/4" 3/8" 1/2" 5/8" 3/4" 7/8" 1-1/8"

Use for

HAVC

Delivery Time

15-20days

Transport Package

Carton Box

Specification

CBB60/CBB61/CBB65/others

Trademark

OEM/ODM

Origin

Jiangsu, Changzhou

HS Code

8532259000

Production Capacity

1000/15days

Key features

Self-Healing Technology: Features good self-healing character and anti-striking current for extended lifespan.
High Safety Standard: Equipped with inner anti-explosion device ensuring reliable safety during operation.
Wide Voltage Range: Rated voltage covers 110V to 450V for versatile application in various systems.
Low Dissipation Loss: High insulation resistance and low dissipation ensure steady electric performance.
OEM/ODM Support: Accepts logo printing and custom designs for personalized branding solutions.
Certified Quality: Products hold VDE0560-8 certification guaranteeing compliance with standards.
Fast Delivery: Standard production time is 15-20 days with options for urgent orders.
Broad Application: Ideal for air conditioners, compressors, and dryers in HVAC systems.

Company profile

Changzhou Dabund Pipe Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceExperienced TeamSelf-branded
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 9 Years CertifiedNearest Port: Shanghai Port, Ningbo Port, Shenzhen Port, Qingdao PortAverage Response Time: ≤2.19h

About Our Factory & Business Background

AddressNo. 20 Dongtang Road, Zhenglu Town, Tianning, Changzhou, Jiangsu, China
Plant Area394.71 square meters
Number of Employees20
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity50 Pcs
Supply Chain Partners50

Our Production Capability & Technical Expertise

Main ProductsAir Condition Copper Lineset, Insulated Copper Pipe, Air Conditioner Bracket, Air Condition Lineset Cover, Rubber Damping Pad
QA/QC inspectors2 people
Inspection Type for Finished ProductsRandom inspection(Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers2 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2016-01-04
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff12
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What are the payment terms?
A:
We accept TT, L/C at sight, credit card, LC, T/T, D/P, PayPal, Western Union, and small-amount payment.
Q:Is it possible to get a free sample?
A:
Yes, we can send free samples; you only need to cover the express shipping cost.
Q:What is the lead time for samples and production?
A:
Existing samples take 2 days, customized samples take 5-7 days, and production time is 15-20 days.
Q:Can I customize the logo or design?
A:
Yes, we accept OEM and ODM services, including logo printing and customization from samples or designs.
Q:What is the standard delivery time?
A:
Usually 15-20 days. For urgent orders, please inform us in advance to arrange faster delivery.

Send Inquiry

*To:Changzhou Dabund Pipe Co., Ltd.Changzhou Dabund Pipe Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like